Laserfiche WebLink
s 0 <br /> 6) Slug testing in selected wells to determine the <br /> hydraulic parameters of the saturated horizon beneath <br /> the site. <br /> In addition to the above recommendations, Aegis is monitoring <br /> monthly for the presence of free product. If free product is <br /> observed in a monitoring well interim free product recovery will <br /> be initiated. This interim measure will be accomplished by hand <br /> bailing and documenting free product recovery rates. <br /> Thank you for your continued cooperation on this matter. If you <br /> have any questions please call me at (916) 782-2110. <br /> Sincerely, <br /> Aegis Environmental Inc. <br /> Brian H. Garber <br /> Project Manager <br />