My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 3:40:51 PM
Creation date
12/3/2019 3:00:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Union .lee Company - VIZMr.Street Facility <br /> phase III Continuiiig Re-Excavation Activities <br /> 11, Phase III Remediation <br /> Page: 3 <br /> size and shape of this excavation may vary according to actual rontarni::ant distrib.:tio� <br /> once the excavation is underway. Figure 3 shows the approximate limits of the soil <br /> contamination. <br /> The overburden .vill be stockTiled on the asplialt at the west end of the property. This <br /> stockpile will be sampled. If the results of the contaminated soil are over 50 ppm, then <br /> an aeration permit will be taken out from the Air Pollution Control District. Clean <br /> soils from the west end of the property will be used to backfill the excavation. <br /> The walls and bottom of the excavation will be sampled to insure that all of the <br /> contaminated soil is removed. The Soil will be excavated until an "ND" level is <br /> reached in the sidewalls and at the bottom of the excavatio:.. Samples will be ar alyzed <br /> by a Slate certified mobile lab, Exelchem, which will be on site. Additional <br /> confirmation samples may be sent to Clinical Laboratories of San Bernardino. <br /> Since the water table is slightly artesian, groundwater ;will mare than likely onto the <br /> excavation. If groundwater is impacted by the excavation activities; contaminated <br /> groundwater will be pumped into "Rain For Rent" holding tanks that will be Drought <br /> onto the site. Both the groundwater in the excavation and the water pumped into the <br /> holding tank's will be analyzed. The analysis will be conducted by Excichern <br /> (groundwater in the excavation), and by Clinical Laboratories of Sari Bernardino <br /> — lgroitndwater in the holding tanks). If the groundwaiei' is "NLS then 7t Will 1)e <br /> disposed of to the Stock-ton POTW. <br /> A PID (photo ionization detector) will be present on site during the drilling activities to <br /> monitor the air around thv excavation. The excavation contractor will. be Warren E. <br /> Gomes Excavating, Inc. (Contractors' License No. 279646). <br /> 4.0 SAMPLING PROTOCOL <br /> All soil sampling equipment will be thoroughly cleaned with TSP (trisodium phosphate) <br /> before and between sampling to prevent cross contamination.. Soil sampling in the <br /> excavation will be taken with brass tubes, drivon. into the side,,valls and the bottom of <br /> the excavation. The number of samples will be deterinine'd h-d the sii,e of the <br /> excavation. <br /> The soil samples will not have head space and will be immediately sealed in their liners <br /> using aluminum foil lined plastic caps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.