My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0080751 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
2600 - Land Use Program
>
SR0080751 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:01:11 PM
Creation date
12/3/2019 3:38:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0080751
PE
4301
STREET_NUMBER
20500
Direction
S
STREET_NAME
HOLLY
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21216020
ENTERED_DATE
6/14/2019 12:00:00 AM
SITE_LOCATION
20500 S HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rAcwuru.ror ane small amounL of weep percoiauon �rairuaii-r,1l Lnrougn pervious areas of <br /> the site as the onsite portion of the total annual recharge (call it RI). <br /> b) For average year conditions (monthly time steps), estimate the amount (or percentage) of <br /> building site runoff entering the basin that is expected to drain via percolation, as <br /> opposed to being discharged to the regional storm drain system. If the basin is designed <br /> for full retention/percolation of normal year rainfall-runoff, with off-site discharge only <br /> during peak storms, it may be possible to consider all building site runoff as available for <br /> percolation. <br /> c) Estimate the direct rainfall volume (acre-feet) into the basin as part of the water available <br /> for percolation. Since it appears the retention basin capacity is planned to be shared with <br /> another development site (Buildings A&B), include only the portion of direct rainfall <br /> approximating the percentage of the basin allocated for the project. <br /> d) Combine the estimated monthly recharge volumes from (b) and (c), and subtract the <br /> average amount of water lost to evapotranspiration (ET) from the surface of the retention <br /> basin (monthly). For the a shared retention facility, adjust (i.e., reduce) the ET losses <br /> consistent with the percentage of the basin allocated for the project. <br /> e) The sum of(b) + (c) - (d) would give an estimate of the net monthly off-site retention <br /> basin recharge volumes, and the annual total (call it R2). <br /> f) The sum of Ri + 2 wo give—tfie eshmatecT anrivaIiau Il rec�arge,7�,- r usein t e�- <br /> above mass balance equation. <br /> A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.