My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012658
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
ARCHIVED REPORTS_XR0012658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:32:19 PM
Creation date
12/3/2019 3:40:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012658
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- xg - - <br /> 4 <br /> WHF ENVIRONMENTAL CONSULTANTS, INC. <br /> Health & Safety Plan <br /> 1.0 HEALTH AND SAFETY PLAN <br /> WH1'Environmental Consultants, Inc. has adopted the following health and safety <br /> procedures for working with organic vapors and liquid contaminants encountered <br /> during drilling and excavation of subsurface soil. The purpose of this program is to <br /> provide health and safety precautions for the initial and subsequent site visits until the <br /> nature and magnitude of the contaminants have been defined. <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean- <br /> ups will have an assigned responsibility. The outlined responsibilities will <br /> establish standards for personnel protective wear, safety procedures and provide <br /> for emergency actions which could arise during project operations. <br /> 1.2 Project Manager(PM) <br /> The Project Manager directs all project operations. Project Manager (PM), in <br /> cooperation with the Project Safety Officer(PSO), has the primary <br /> responsibility for ensuringeSa��o�idyp moons allowed around or within <br /> d, signed, and fully <br /> understood by all employ <br /> designated working perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at all times <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> Plan. <br /> 1.3 project Safety officer(PSO) <br /> The PSO shall direct and ensure that all employees comply will' the Health and <br /> Safety Plan. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site.personnel, __...._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.