My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012658
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
ARCHIVED REPORTS_XR0012658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:32:19 PM
Creation date
12/3/2019 3:40:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012658
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ <br /> Ri <br /> W,UF Environ,nental Consultants, Inc. <br /> rlealth & Safety Plan <br /> Page: 3 <br /> elevated to an <br /> Should for le'yel of entry forconditions <br /> ate working, based o i1 heeProject Safety Officer <br /> appropriate <br /> ' (PSO) and Project Manager (Pl`vi). <br /> ning <br /> c Safety <br /> Should at any t► r�ecah tilos can bel Of e implemented bge, the y thelmanagcr d. <br /> equipment <br /> equipment anal p <br /> This is fully defined in the fUliowing sections. <br /> ?.O SA FE TYIMPLEMENT,4TION <br /> The provisions of the WHF Environmental Consultants, Ill(.,. <br /> idhoperlflonsy flan <br /> are mandatory for all personnel associated with the site project <br /> A complete background n:vlew and site visitation willbe conducted in order to <br /> determine whether specitre,cm snWtlnch may ents are a sbe made to St on the joblrsite.ealth and Safety Any suspected Plan <br /> based on specific characters,.lc <br /> hazards associated with the o -sltc inog ns orlich human steriiar tssure to,,will be ldoccumented <br /> absorption, to such as suspected <br /> and specific guidance will be developed and added 10 this Health and Safety Plan as <br /> .Appendices. <br /> project si.e la out is paramount to the safe completion of all remedial site <br /> A defined p ro j Y <br /> investigations. The project site layout has b+lilt-in safety erstonnel rotectives divide <br /> into three zones. The following list defines the required Q 1 <br /> equipment. <br /> 2.1 Personnel Pr()IeC,;Ve&luipment (PPI') <br /> n zone of <br /> le job <br /> Personnel who will Ile rrol rtivc egmipn or mcntl,uhd pica:;tlrss as warrant by the <br /> will use the to.loN ing l <br /> Project M,.nager: <br /> - COVCral1S as an underb3"I"Cnt <br /> - Saranex outer garment <br /> - Sample gloves (inner) <br /> PVC. Nitrile or Ncnprene outer;laves <br /> Hard hat <br />
The URL can be used to link to this page
Your browser does not support the video tag.