Laserfiche WebLink
WfIF I;nvir()=enlal Consultants, Inc. <br /> health & Safely Ylan <br /> Page: 4 <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - pull facepiece respirator with R53HR cartridges (a combination of <br /> gas, pesticide, radionuclide, high efficiency li <br /> organic vapor, acid !tcr}. <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilizedif project dictates <br /> More stringent protective equipment requirements will be implemented if <br /> necessary. This determination will be made by the project supervisor after <br /> review of the materials to be handled, the ambient monitoring data consultation <br /> management <br /> with on-site technical personnel, the Safety Officer, and the prop <br /> er personnel. Upgrades in PPE, if necessary, will be implemented. <br /> 2,2 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety <br /> implementations: <br /> 2.3 Daily Safety Meetings <br /> Each day prior to commencing work, a safety meeting shall be held to discuss <br /> safety considerations for the day's work to be done. A safety topic shall be <br /> addressed each day from the following list: <br /> - Site Safety Plan (first day and once a week thereafter) <br /> - Fire Fighting Techniques <br /> - Defensive Driving <br /> - Decontamination <br /> - Levels of Protection <br /> - Heat Stress <br /> Emergency Equipment on Site <br /> confiner! Space Entry Procedure- Respirator Maintenance <br /> Self-contained Breathing Apparatus Training (if necessary) <br /> 2.4 Safety Log <br /> A safety lou shall be kept for the project Ivor's1te. <br />