My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012658
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
ARCHIVED REPORTS_XR0012658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:32:19 PM
Creation date
12/3/2019 3:40:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012658
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WfIF I;nvir()=enlal Consultants, Inc. <br /> health & Safely Ylan <br /> Page: 4 <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - pull facepiece respirator with R53HR cartridges (a combination of <br /> gas, pesticide, radionuclide, high efficiency li <br /> organic vapor, acid !tcr}. <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilizedif project dictates <br /> More stringent protective equipment requirements will be implemented if <br /> necessary. This determination will be made by the project supervisor after <br /> review of the materials to be handled, the ambient monitoring data consultation <br /> management <br /> with on-site technical personnel, the Safety Officer, and the prop <br /> er personnel. Upgrades in PPE, if necessary, will be implemented. <br /> 2,2 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety <br /> implementations: <br /> 2.3 Daily Safety Meetings <br /> Each day prior to commencing work, a safety meeting shall be held to discuss <br /> safety considerations for the day's work to be done. A safety topic shall be <br /> addressed each day from the following list: <br /> - Site Safety Plan (first day and once a week thereafter) <br /> - Fire Fighting Techniques <br /> - Defensive Driving <br /> - Decontamination <br /> - Levels of Protection <br /> - Heat Stress <br /> Emergency Equipment on Site <br /> confiner! Space Entry Procedure- Respirator Maintenance <br /> Self-contained Breathing Apparatus Training (if necessary) <br /> 2.4 Safety Log <br /> A safety lou shall be kept for the project Ivor's1te. <br />
The URL can be used to link to this page
Your browser does not support the video tag.