Laserfiche WebLink
Z" EXECUTIVE SUMMARY <br /> 4 <br /> Once the required amount of ground water <br />� q gr has been extracted from <br /> both sites, all ground water monitoring wells will be sampled to assess <br /> the effectiveness of the extraction process. Zf the monitoring well data <br /> show that residual levels of constituents are still present in the ground <br /> water at one or both of the sites, the concentration reduction achieved <br /> will be evaluated to assess whether continued extraction is likely to <br /> result in the desired cleanup within the required time period. If the <br /> evaluation indicates that additional treatment is required, biological <br /> treatment of the ground water will be instituted ..' If follow-on work is <br /> required, the additional work will be defined in cooperation with the <br /> EHD. i <br /> r <br /> I� <br />'I :, <br /> 3J <br /> IF <br /> 1 <br /> I <br /> .Il <br /> I 1', <br /> I� <br /> 6 <br /> t <br /> .w <br /> �� <br /> p <br /> JN <br /> I� <br /> i <br /> i� <br /> i <br /> 4 <br /> F <br /> I� Fio <br />