S <br /> Ms. Mary Meays Page 2 <br /> May 16, 1994 <br /> H will be collected to verify the results of the confirmation samples. These <br /> activities will be addressed in the additional investigation workplan, which <br /> will be submitted to PHS/EHD by May 25, 1994. <br /> SPECIFIC COMMENTS <br /> 1. Table I in the report incorrectly represented results of laboratory analysis of <br /> sample, E72N1, the lab reported 0.0380 xylene instaed of 0.380 xylene as the <br /> table indicated. <br /> The correct concentration value for xylene detected in sample E72N1 is 0.038 <br /> mg/kg. The value of 0.380 mg/kg reported in Table 1 is incorrect. The <br /> revised Table 1, which reflects the correct value for sample E72N1, is <br /> attached. <br /> 2. Tank #1 area <br /> a. Sample, W9S7, collected on October 7, 1993 at 6 feet, evidenced soil <br /> contamination; however, its location was not indicated on Figure 4. <br /> Soil sample location W9S7 was not a confirmation soil sample and was <br /> collected within the boundaries of the final excavation (note the reference <br /> point on Figure 4 from which all sample location distances were measured). <br /> This soil sample was collected during excavation activities to determine <br /> whether or not the extent of affected soils had been defined. After the <br /> sample result indicated the presence of chemicals above cleanup goals, <br /> excavation of soils continued in that area. The soils defined by sample W9S7 <br /> were excavated and treated; therefore, its location was not depicted on <br /> Figure 4. <br /> b. Sample, 1BN11 W16, collected on October 15, 1993 at 9.5 feet, evidenced soil <br /> contamination; however, its location was not indicated on Figure 4. <br /> Soil sample location 1BN11W16 was collected from the bottom of the <br /> excavation below the depth of the water table (this location should have <br /> been depicted on Figure 4). A revised Figure 4, which includes the location <br /> for sample 1BN11W16, is attached. Seepage of ground water was <br /> encountered at excavation depths below seven feet. Attempts to excavate <br /> soils from depths greater than 9.5 feet were unsuccessful (note that the <br /> approved Final Remediation Plan stated that soils near the clay/silt layer <br /> and sand layer interface (i.e., below the water table) would most likely be <br /> much too wet to excavate). Nonetheless, the analytical results for sample <br /> 1BN11W16 were 20 mg/kg TPH-gasoline, 0.043 mg/kg toluene, 1.077 mg/kg <br /> ethylbenzene, and 0.104 mg/kg xylenes. These results are below the cleanup <br /> goals of 100 mg/kg TPH-gasoline and very near the cleanup goal of 1 mg/kg <br /> total BTEX compounds established in the Final Remediation Plan. <br />