My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0080912 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
3732
>
2600 - Land Use Program
>
SR0080912 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:11:11 PM
Creation date
12/4/2019 8:50:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0080912
PE
2602
STREET_NUMBER
3732
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17916050
ENTERED_DATE
7/18/2019 12:00:00 AM
SITE_LOCATION
3732 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring of the Leachline Trenches and Seepage Pits: Monitoring of effluent shall be by two <br /> monitoring/inspection ports within each leachline trench; at the beginning and at the ends of each <br /> leachline, as noted on the Project Plans. Monitoring/inspection tubes: 4" PVC Tee at the <br /> soil/effluent interface with 4" riser extending into a Christy/irrigation box, with a threaded cap. <br /> IV. CONCLUSIONS AND RECOMMENDATIONS <br /> NLS§ 4.1. The nitrate loading calculations show the resultant effluent from the entire subject <br /> Parcel will theoretically possess a nitrate-nitrogen concentration of 5.6 ppm nitrate-nitrogen or 25 <br /> ppm nitrate, which is below the Federal nitrate Maximum Contaminant Level (MCL) of 10 ppm <br /> nitrate as nitrogen or 45 ppm as nitrate. These nitrate loading determinations exclude factoring a <br /> 10%-30%reduction in nitrogen concentrations that can occur in septic tanks (See Oakley,Page 12). <br /> SSS§5.4, 6.8. The shallow soils underlying the subject property show a permeability that is quite <br /> varied. Leachline trench soils possess a comparatively slow permeability at 31.3 min/inch with a <br /> 0.522 gallons/ft2/day application rate. The seepage pit soil depth possess a permeability of 6.8 <br /> min/inch, with an application rate of 0.800 gallons/ft2/day. <br /> As illustrated on the attached Plans, the OWTS design will consist of 4 - 90 ft leachline trenches, 2 <br /> ft wide and a maximum of 42 inches deep. At the ends of each leachline, a 42-inch dia. seepage <br /> will be installed. The following calculations demonstrate adequate soil-effluent interface area to <br /> manage the anticipated flow volumes: <br /> 4 sf/1' LL x 90' LL=360 sf x 4 LLs= 1440 sf x 0.522 AR=752 gpd <br /> 4 SPs x 228 sf= 912 sf x 0.800 AR=730 gpd <br /> 1,482 gpd. Calculated ADF = 1,536 gpd <br /> NLS§4.2, SSS§6.7. The OWTS design for the proposed Heaven Temple takes advantage of the <br /> leachline clay soils for bacteriological/viral treatment and mitigation impedance of nitrification by <br /> keeping the effluent within the trenches before it flows into the seepage pits, which may occur under <br /> highly stressed conditions. <br /> Page -10- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.