Laserfiche WebLink
1 <br /> 1 Water samples were placed in containers provided by the laboratory <br /> Water samples were labelled with a unique sample number, the <br /> project name and location, the date and time, and the sampler's <br /> initials Samples were then placed in Zip-Lock® type plastic bags, <br /> sealed, and placed in an iced cooler. Information noted on the label <br /> was recorded on a <br /> chain-of- <br /> deliveredorm After under chain offmcustody to <br /> letion of <br /> drilling, the samples were <br /> Sequoia Analytical, a California-certified laboratory. <br />' Geophysical SurMey. On December 4, 1992, a geophysical survey of <br /> Tank Site #2 was performed by Spectrum Environmental Geophysics. <br /> The survey was performed using both a magnetometer and ground <br />' penetrating radar to locate the potential presence of buried objects <br /> and/or debris at the site. The survey investigated a 150-foot by 150-foot <br /> area which covered the entire site investigation area north of the <br /> warehouse building (including all boring locations except MW-4A <br />' inside the warehouse) and extended to the edge of the Stockton Deep <br /> Water Channel The d ob objects or debris over the entire survey areults of the investigation found no aaies <br /> characteristic of burie <br />' <br />' <br /> S=Wc <br /> Selectedsamples soil les and ground water samples were analyzed for <br /> P <br /> the following constituents <br /> • Total Petroleum Hydrocarbons (TPH) as Gasoline and Diesel, <br /> ' 0 Total Lead; <br /> • Organic Lead; and <br /> ' 0 Ethylenedibromide (EDB). <br /> For QA/QC purposes during the ground water sampling, field blanks <br /> ' and trip blanks were collected <br /> water samples prior to <br /> The laboratory did not filterany of he ground <br /> ' analysis. <br /> Phase II Investigation <br /> The Phase II Investigation conducted on April 8, 1993 included the <br /> installation of one additional ground water monitoring well (MW-5A) <br /> ' and four soil borings. This section describes the preparatory work <br /> performed prior to initiating <br /> ' initiata get d activities, <br /> well <br /> construction and drilling � d the soil and d water <br /> sampling procedures <br /> 5-8 <br />