My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007903
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:31:25 PM
Creation date
12/5/2019 2:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007903
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br /> 1 INTRODUCTION <br /> 1 <br />' This document is a work plan for additional soil and round water <br /> P g <br /> investigation of Former Underground Storage Tank (UST) Site #2 <br /> 1 located at 1325 West Weber Avenue, Stockton, California (San Joaquin <br /> County) (Figure 1) The UST was situated adjacent to an active <br /> warehousing facility at 1325 West Weber Avenue and was removed in <br /> 1 1991 The facility is currently occupied by Graphic Contractors <br /> The purpose of this investigation is to determine the lateral extent of <br /> 1 petroleum hydrocarbons (Total Petroleum Hydrocarbons as Gasoline <br /> (TPH-G) and Diesel (TPH-D)), and related constituents (Benzene, <br /> 1 Toluene, Ethyl benzene and Xylene (BTEX)) in the soil and ground <br /> water to the north and east of the tank excavation ERM-West, Inc <br /> (ERM) conducted an investigation of the site in 1992 and found <br /> elevated levels of these constituents in soil and ground water at MW- <br /> 1A (north of the UST excavation) and in soil at MW-3A (east of the <br /> UST excavation) (Figure 1) Further investigative work is required to <br />' (1) delineate the lateral extent of these petroleum compounds to the <br /> north and east, and (2) evaluate potential remedial alternatives, if <br /> required <br />' The results of this work will be incorporated in to a Problem <br /> Assessment Report (PAR) that will be developed for the site in May <br />' 1993 The PAR will be the basis for evaluating remedial alternatives, if <br /> required <br />' Section 2 describes the details of the investigation activities Section 3 <br /> outlines the reporting of the project activities and results Section 4 <br /> contains the health and safety plan for the investigation <br /> 1 <br /> 1 <br /> 1 <br />' 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.