My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007928
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:39:37 PM
Creation date
12/5/2019 2:20:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007928
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SECTION 6 <br /> IMPLEMENTATION S CHED ULE <br /> 1 <br /> The implementation schedule for the proposed remediation is described <br /> below The estimated duration of the major tasks is as follows <br />' TASK DESCRIPTION TASK DURATION <br /> 1 Mobilization 1 week <br /> Excavation 1 week <br /> Data Analysis 1 week <br /> Backfill 1 week <br /> Reporting 2 week <br /> TOTAL DURATION 6 weeks <br /> The scheduling assumptions and contingency requirements for each of <br /> these tasks are further described below <br /> Mobilization <br />' As described in Section 5, this task includes contracting with <br /> subcontractors, identifying and testing backfill, obtaining the required <br /> permits, and preparing the health and safety plan <br /> This task will initiate immediately upon PHS/EHD approval of the <br />' activities described in the plan We have assumed that the grading pernut <br /> can be obtained within 1 week Similarly, we have assumed that the <br /> subcontractors can be mobilized within one week <br /> Excavation <br /> Because only a small amount of soil will require excavation, the actual <br /> excavation should be completed quickly (e g, within 2 to 3 days) If <br />' shoring is required, the excavation schedule would be extended an <br /> additional day <br /> 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.