Laserfiche WebLink
i <br /> SECTION 6 <br /> IMPLEMENTATION S CHED ULE <br /> 1 <br /> The implementation schedule for the proposed remediation is described <br /> below The estimated duration of the major tasks is as follows <br />' TASK DESCRIPTION TASK DURATION <br /> 1 Mobilization 1 week <br /> Excavation 1 week <br /> Data Analysis 1 week <br /> Backfill 1 week <br /> Reporting 2 week <br /> TOTAL DURATION 6 weeks <br /> The scheduling assumptions and contingency requirements for each of <br /> these tasks are further described below <br /> Mobilization <br />' As described in Section 5, this task includes contracting with <br /> subcontractors, identifying and testing backfill, obtaining the required <br /> permits, and preparing the health and safety plan <br /> This task will initiate immediately upon PHS/EHD approval of the <br />' activities described in the plan We have assumed that the grading pernut <br /> can be obtained within 1 week Similarly, we have assumed that the <br /> subcontractors can be mobilized within one week <br /> Excavation <br /> Because only a small amount of soil will require excavation, the actual <br /> excavation should be completed quickly (e g, within 2 to 3 days) If <br />' shoring is required, the excavation schedule would be extended an <br /> additional day <br /> 6-1 <br />