Laserfiche WebLink
1 <br /> Data Analysis <br /> The schedule assumes that the confirmation samples will be analyzed <br /> under an expedited turn-around time, and that the results will be <br />' available within one week of sample collection <br />' Backfill <br /> Backfilling 1s expected to require 1 to 2 days, and will be conducted upon <br />' receipt of the confirmation sampling results <br />' Reporting <br /> The closure report is envisioned as being a brief report documenting <br />' completion of the proposed remediation activities The report will include <br /> photographs of the activities, as well as documentation pertaining to the <br /> transport, disposal and backfilling activities (e g, trucking and landfill <br />' records) The closure report will be submitted to PHS/EHD, along with a <br /> letter requesting site closure within two weeks of completion of the field <br />' activities <br /> 6-2 <br />