Laserfiche WebLink
PART 4 <br /> CONTRACTOR FURNISHED ITEMS AND SERVICES <br /> 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: <br /> 4.1 General: <br /> The Contractor shall furnish all supplies,equipment,facilities and services required to perform work under this <br /> contract that are not listed under Section 3 of this PWS. <br /> 4.2 Secret Facility Clearance: <br /> Not applicable. <br /> 4.3. Materials: <br /> The Contractor shall provide all well construction and boring decommissioning materials(eg.,well casing and <br /> screen,centralizers,filter pack sand,bentonite,grout,well surface protection features,well identification tags, <br /> decontamination detergents,etc.)necessary to meet the requirements under this PWS. <br /> 4.4. Equipment: <br /> The Contractor shall provide all drilling,well installation,well development,boring decommissioning,and survey <br /> equipment to meet the requirements under this PWS. This equipment is envisioned to include,but not be limited to, <br /> the following:rotosonic drill rig,support vehicles,potable water storage,temporary steel drill casing,soil core <br /> barrel,plastic sleeves for retaining soil cores,groundwater grab sampling equipment,decontamination equipment, <br /> soil and waste water storage drums,and personal protective equipment. <br />