My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:59:14 PM
Creation date
12/6/2019 2:48:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 9 <br /> fi`fi ��;� 'e ,. <br /> }ty}f <br /> t i ff' �Ft fj�EAC•Tit <br /> it <br /> PFA 9;` 114 Ptl?: 3 3 <br /> APEX ENVIROTECH, INC. <br /> 7844 Madison Ave., Suite 106, Fair Oaks, CA 95628 Tel 916.535.0200 Fax 916.535.0207 <br /> March 3, 1994 <br /> Ms. Margaret Lagorio <br /> San Joaquin County Public Health Services <br /> Environmental Health Division -- <br /> 445 N. San Joaquin Street <br /> - Stockt6n—;`CA`9520-1 0388"-_ <br /> Subject: Moore Petroleum Bulk Plant <br /> 5491 F Street, Banta, California <br /> i <br /> . i <br /> Dear Ms. Lagorio: <br /> Apex Envirotech, Inc. (Apex),has been authorized by Moore Petroleum(Moore)to <br /> respond to your office's letter dated February 28'; 1994. In April, 1993, Aegis <br /> Environmental Inc. (Aegis), installed a free product skimmer in monitoring well MW-1. <br /> On January 14, 1994, Apex removed the skimmer and collected a groundwater sample, <br /> since no free product was noted in this well. Prior to Apex acquiring this project in <br /> January, 1994, approximately 20 gallons of product/water mixture were removed from <br /> monitoring well MW-1. The product/water mixture has been stored in appropriate DOT <br /> barrels on site. <br /> In June, 1992, your office agreed with a request that active remediation is not needed at <br /> this—time—and your February 28, 1994.1etter reiterates this noting that over-excavation and _ <br /> groundwater vacuum extraction at the time of tank replacement in early 1995 is a viable <br /> method of remediating contaminated soil and groundwater. Since your June, 1992, <br /> determination, free product is longer showing up'in well MW-1 and the petroleum E <br /> concentrations in the remaining five wells are below drinldng water standards. With these <br /> remediation activities scheduled for early 1995 and no present on-going remediation at the <br /> site, Apex feels justified in requesting the change in monitoring frequency from quarterly t <br /> to semiannually. <br /> f <br /> E <br /> f <br /> 4 <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.