My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:59:14 PM
Creation date
12/6/2019 2:48:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drilling and Trenching Along the Right-of-Way of Sixth Street <br /> Proposed drilling and trenching along Sixth;Street is characterized as a short-term and <br /> stationary work area. The use of flaggers is;optional, especially considering.the low <br /> traffic, low speed nature of the road. However, because the approach to the open side of <br /> the road is not entirely visible by those traveling west on F Street, or traveling south on <br /> Sixth Street, Apex chooses to utilize one flagger as a mirror to assist drivers through the <br /> construction area during drilling and trenching along the length of Sixth Street. The <br /> flagger will be positioned within the cone barrier-close.to the center of the intersection, I <br /> .and be clearly visible to motorists coming from any direction. A yield or stop sign will <br /> be installed 25-feet east of the intersection on F Street, and 40 ft. north of the northern <br /> extent of the work_area. Stopped motorists will yield to oncoming traffic of the <br /> remaining open lane. Thus, the provision will be made for alternate one-way movement <br /> through the constricted section. Motorists will also be forewarned by"Prepare to Stop" <br /> and "One Lane Ahead"signs placed 100 and 150 feet,respectively, before the <br /> corresponding stop sign. All placements of signs and cones may be altered as I <br /> construction proceeds to benefit safety and continuity as sound judgment directs. <br /> Trenching Across Sixth Street <br /> . I <br /> While cutting the asphalt, removing the material and placing the ozone supply lines, one <br /> lane will be left open at all times. Once the trench cuts have reached the middle of the <br /> street, the lane closure will shift to close''the other lane. Principles discussed in the above <br /> traffic plan will be followed,with the addition of steel trench plates to bridge the trench <br /> of the open lane once the material has been removed. <br /> If you have any questions or comments, please call us at (916) 851-0174. <br /> Sincerely, <br /> APEX ENVIROTECH, INC. <br /> Richard Johnson <br /> Remediation Department Manager <br /> Cc; Mr. Jerry Moore <br />
The URL can be used to link to this page
Your browser does not support the video tag.