My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 2:59:14 PM
Creation date
12/6/2019 2:48:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVIdS f 1 L P Y <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D. M.P.H., Health Officer <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 9`'FOR4 <br /> 209/468-3420 <br /> JERRY MOORE <br /> MOORE PETROLEUM <br /> 5491 F STREET <br /> BANTA CA 95304 <br /> RE: WORKPLAN FOR INTERIM REMEDIATION <br /> 5491 F STREET <br /> BANTA,CA 95304 <br /> WORKPLAN: Work Plan for Interim Remediation and 4th Quarter Groundwater Monitoring Report <br /> DATED: 11/17/00 <br /> PREPARED BY:Apex Envirotech,Inc. <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> csubd. . <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S 25299.37 ( )( )3 ): <br /> 1. Install an interim remediation system consisting of three recovery wells and one vapor extraction well <br /> to reverse the migration of MtBE offsite <br /> 2. Door-to-door well search of a 2,000-foot radius around the site (completed). <br /> COMMENTS AND CONDITIONS: <br /> 1. Wells must be constructed in accordance with San Joaquin County standards as well as California <br /> State standards <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN(H86 25299.37,subd.(C)(3).): <br /> None. <br /> DATED 11/30/00 BY Dot Lofstrom <br /> cc: CVRWQCB—Marty Hartzell <br /> Apex Envirotech-Tom Landwehr(fax) <br /> i <br /> I <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.