Laserfiche WebLink
Workplan for Ozone Sparging <br /> _ Moore Petroleum Bulk Plant,5491 F Street,Banta;California <br /> Page 6 <br /> a standard 120-v6lt power supply. All construction will completed in,accordance with the rules <br /> and regulations set forth by the, Sari.Joaquin County Building Codes <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> It is noted'that TPH as diesel •(TPHd) concentrations in wells MW-1,MW-3,'MW=8; MW-10 <br /> VEW-2, and VEW-3 are not decreasing; some non-volatile TPHd compounds are being <br /> classified as TPH as motor oil' (TPHmo) in-the groundwater samples. ,These less volatile <br /> compounds will not be removed by. soil vapor extraction. Therefore, Apex recommends <br /> installing an,in-situ chemical oxidation system to remove the TPHd/TPHmo mass from the soil, <br /> and groundwater; and reduce groundwater concentrations to non-detect'for these compounds. <br /> . - - ' .. - �. y - • it t <br /> 4. <br />