r...� N%Wol <br /> Confirmation Soil Vapor Survey Workplan <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 5 <br /> June 29,2007-Apex issued a letter to the SJCEHD suggesting that additional sampling be <br /> performed in the area around CPT-2 to confirm the presence of weed oil 30 feet bgs. Apex also <br /> recommended that proposed well MW-15 be installed to the original depth of 20 feet bgs. <br /> October 31,2007-Apex advanced and sampled 13 soil vapor points at the subject site. Results <br /> of the soil vapor survey are documented in Apex's Soil Vapor Survey Results Report, dated <br /> December 12, 2007. <br /> March 12, 2008-The SJCEHD issued a letter requesting a fate analysis of proposed sample <br /> analyte list(DAP, DBP, Dino Scb). The SJCEHD also approved the installation of well MW-15 <br /> to the originally proposed depth of 20 feet bgs. <br /> May 8, 2008-The SJCEHD issued a letter approving the Sample Reduction Request Letter <br /> dated January 23, 2008. The SJCEHD approved the following groundwater monitoring <br /> frequency of; quarterly sampling of MW-3, MW-7, MW-8, MW-10, MW-11, VEW-2, RW-2 and <br /> newly installed MW-15; semi-annual sampling of MW-4A, and MW-12; and annual sampling of <br /> MW-2, MW-5, MW-6, MW-9, MW-13, MW-14, MW-16, and MW-17. <br /> August 18, 2008 -Apex installed monitoring well MW-15 to a total depth of 20 feet bgs. Apex <br /> submitted the results of the installation in a results report on December 8, 2008. <br /> April 30, 2009-Apex submitted a letter to the SJCEHD requesting that the analytical suite for <br /> groundwater samples be reduced to include only total petroleum hydrocarbons as gasoline <br /> (TPHg), as diesel (TPHd), as kerosene (TPHk), and as motor oil (TPHmo). The reduced <br /> analytical suite was approved in a letter from the SJCEHD dated July 2, 2009. <br /> June 12, 2009-Apex submitted a Monitoring Well Installation Workplan proposing to install a <br /> deep screened well to a depth of 80 feet bgs via conductor casing to 52 feet bgs to determine the <br /> vertical extent of contamination at the site. The workplan was approved by the SJCEHD in a <br /> letter dated July 2, 2009, under the condition that the well be installed with 10 feet of screen. <br /> July 2, 2009-Apex received a letter form the SJCEHD reducing the required sampling <br /> frequency for wells at the site. Under the new sampling program, wells MW-3, MW-4A, MW-7, <br /> MW-8, MW-10, MW-11, MW-12,RW-2,and VEW-2 will be sampled semi-annually and wells <br /> MW-2,MW-5, MW-6, MW-9, MW-13,MW-14, MW-16, and MW-17 will be sampled <br /> annually. The letter did not provide sampling frequencies for wells MW-1 and MW-15. The <br /> letter recommended that the SVE system be turned off to perform rebound testing. Additionally, <br /> the letter approved a confirmation soil vapor survey during the SVE system rebound testing to <br /> further assess the risk posed by vapor intrusion at the site. <br />