APEX ENVIROTECH, INC.
<br /> STANDARD OPERATING PROCEDURE j
<br />+' r Monitoring Wells
<br /> SOP - 4
<br /> SOP - 1 SAMPLE ]IDENTIFICATION AND CHAIN-
<br /> SOIL BORING SAMPLING OF-CUSTODY PROCEDURES
<br /> ' s
<br /> I During drilling,soil samples for chemical analysis are collected Sample identification and chain-o€-custody procedures ensure
<br /> j in thin-walled brass tubes,of varying diameters and lengths sample integrity as well as document sample possession from
<br /> (e.g..4 or 6 inches long by 2 inches outside diameter). Three the time of collection to ultimate disposal, Each sample
<br /> or four of the selected tubes,plus a spacer tube,are set in an container submitted for analysis is labeled to identify the jab
<br /> 18-inch long split-barrel sampler of the appropriate Inside- number,date,time of sample collection,a sample number
<br /> diameter. unique to the sample•any in-field measurements made,
<br /> sampling methodology,name(s)of cn-site personnel,and any
<br /> Where possible,the split-barrel sampler is driven its entire other pertinent field observations also recorded on the field
<br /> length either hydraulically or using a 140-pound drop hammer.. excavation or boring log.
<br /> The sampler is extracted from the borehole and the brass
<br /> tubes,containing the soil samples,are removed. Upon removal Chain-of-custody forms are used to record possession of the
<br /> from the sampler,the selected brass tubes are either sample from time of collection to arrival at the laboratory.
<br /> immediately trimmed and capped with aluminum fail or"Teflon" During shipment,the person with custody of the samples will
<br /> E sheets and plastic caps or the samples are extruded from the relinquish them to the ne)d person by signing the
<br /> chain-of-tubes and sealed within other appropriate,cleaned sample custody form(s)and noting the date and time. The sample-
<br /> containers. The samples are then hermetically sealed,labeled, control officer at the laboratory will verify sample integrity,
<br /> and refrigerated for delivery,under strict chain-of-custody,to correct preservation,confirm collection in the proper
<br /> the analytical laboratory. These procedures minimize the container(s),and ensure adequate volume for analysis.
<br /> potential for cross-contamination and volatilization of volatile
<br /> organic compounds(VOC)prior to chemical analysis. If these conditions are met,the samples will be assigned
<br /> unique laboratory log numbers for identification throughout'
<br /> One soil sample collected at each sampling interval is analyzed anal is and reporting. The log numbers will be recorded on
<br /> P P 9 Yz .Ys P
<br /> in the field using either a portable photoicnizatfon detector the chain-of-custody forms and in the legally-required log book
<br /> (PID),flame ionization detector,organic vapor analyzer, maintained in the laboratory. The sample description,date
<br /> Ik catalytic gas detector,or an explosimeter. The purpose of this received,client's name,and any other relevant information will q�
<br /> field analysis is to qualitatively determine the presence or also be recorded.
<br /> absence of hydrocarbons,and the samples to be analyzed at
<br /> the laboratory. The soil sample is sealed in either a brass tube,
<br /> glass jar,or plastic bag to allow for some volatilization of VOC. SOP - 5
<br /> The PID is then used to measure the concentrations of LABORATORY ANALYTICAL QUALITY i
<br /> hydrocarbons within the containers's headspace. The data is ASSURANCE AND CONTROL
<br /> recorded on both field notes and the boring logs at the depth
<br /> corresponding to the sampling point. In addition to routine instrument calibration,replicates,spikes,
<br /> blanks,spiked blanks,and certified reference materials are
<br /> Other soil samples are collected to document the soil and/or routinely analyzed at method-specific frequencies to monitor
<br /> stratigraphic profile beneath the project site.and estimate the precision and bias. Additional components of the laboratory
<br /> relative permeability of the subsurface materials. All drilling Quality AssurancelQualky Control program include;
<br /> and sampling equipment are either steam cleaned or washed in
<br /> solution and doubly rinsed in deionized water prior to use at 1, Participation in state and federal laboratory
<br /> each site and between boreholes to minimize the potential for accreditationicertification programs;
<br /> cross-contamination.
<br /> 2. Participation in both U.S.EPA Performance
<br /> In the event the soil samples cannot be submitted to the Evaluation studies(WS and WP studies)and inter-
<br /> analytical laboratory on the same day they are collected(e.g., laboratory performance evaluation programs;
<br /> due to weekends or holidays),the samples are temporarily
<br /> stored until the first opportunity for submittal either on ice in a 3• Standard operating procedures describing routine j
<br /> cooler,such as when in the field,or in a refrigerator at ApeXs and periodic instrument maintenance;
<br /> office.
<br /> 4. `Out-of-Cantrot"ICorredive Action documentation
<br /> procedures;and,
<br /> SOP - 3
<br /> SOIL CLASSIFICATION 5. Multi-level review of raw data and client reports.
<br /> Soil samples are classified according to the Unified Soil r
<br /> Classification System. Representative portions of the samples SOP - B
<br /> may be submitted,under strict chain-of-custody,to an HOLLOW-STEM AUGER MONITORING
<br /> analytical laboratory for further examination and verification of WELL INSTALLATION AND
<br /> the In-field classification and analysis of soil mechanical and/or DEVELOPMENT
<br /> petrophysleal properties. The soil types are indicated on logs
<br /> of either excavations or borings together with depths Boreholes for monitoring wells are drilled using a truck-
<br /> corresponding to the sampling points and other pertinent mounted,hollow-stem auger drill rig. The borehole diameter
<br /> information. will be a minimum of 4 inches larger than the outside diameter
<br /> of the casing when installing well screen. The hallow-stem
<br /> auger provides minimal interruption of drilling while permuting
<br />
|