My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FIELD
>
1856
>
2900 - Site Mitigation Program
>
PR0523459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:12:55 AM
Creation date
12/10/2019 8:56:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523459
PE
2959
FACILITY_ID
FA0015853
FACILITY_NAME
TYCO ELECTRONICS (FORMER)
STREET_NUMBER
1856
STREET_NAME
FIELD
STREET_TYPE
AVE
City
STOCKTON
Zip
952032037
APN
13339003
CURRENT_STATUS
01
SITE_LOCATION
1856 FIELD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0971c*-1 <br /> SAMPLING PLAN FOR <br /> THE FIELD AVENUE ANNEX FOR <br /> LIKA CORPORATION <br /> Stockton, California <br /> 1.0 PURPOSE OF THE SAMPLING PLAN <br /> The objectives of this sampling program are to conduct a preliminary <br /> investigation of the vertical and horizontal extent of contamination due <br /> to a surface spill and to determine the extent of subsurface <br /> contamination, including contamination of groundwater, resulting from <br /> leaking plumbing, and a leaking sump at the Lika Field Avenue Annex <br /> (Figure 1) . The surface spill occurred at the rear of the Field Avenue <br /> annex. It is believed that a small amount of copper sulfate solution was <br /> spilled onto the dirt strip between the foundation of the annex and the <br /> paved boat storage yard. We anticipate the contamination to be limited <br /> to the near surface. The sump, which may be the biggest source of <br /> contamination, is located in the wet process room. The sump has been <br /> attacked by the acid copper sulfate solution used in the manufacturing <br /> process and has been breached. The other source of contamination may be <br /> a deteriorated section of ductile iron pipe located beneath the concrete <br /> floor in the front of the building. <br /> The sampling plan is separated into two phases. The precise nature of <br /> the second phase will be based upon what is discovered in the first phase. <br /> 2.0 SAMPLING PLAN DESCRIPTION <br /> 2.1 Phase 1 <br /> This phase will examine the suspected surface contamination along the <br /> backside of the Field Avenue annex. It will also investigate whether <br /> subsurface contamination has left the facility and gotten into <br /> groundwater. <br />
The URL can be used to link to this page
Your browser does not support the video tag.