My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FIELD
>
1856
>
2900 - Site Mitigation Program
>
PR0523459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:12:55 AM
Creation date
12/10/2019 8:56:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523459
PE
2959
FACILITY_ID
FA0015853
FACILITY_NAME
TYCO ELECTRONICS (FORMER)
STREET_NUMBER
1856
STREET_NAME
FIELD
STREET_TYPE
AVE
City
STOCKTON
Zip
952032037
APN
13339003
CURRENT_STATUS
01
SITE_LOCATION
1856 FIELD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0963c*-8 a <br /> reports are submitted to the Project Safety Officer. The authority of <br /> the Project Manager is the same as that of the Project Safety officer. <br /> The Site Safety Officer is responsible for assisting the Project <br /> Manager with on-site implementation of this site safety plan. His <br /> responsibilities include: 1) maintaining safety equipment supplies, <br /> 2) performing air quality measurements, 3) directing decontamination <br /> operations and emergency response operations, 4) setting up work zone <br /> markers and signs if such zones are specified in the site safety plan, <br /> and 5) reporting all accidents, incidents, and infractions of safety <br /> rules and requirements to the Project Manager. The Site Safety <br /> Officer has the authority to suspend work any time he determines that <br /> the provisions of the site safety plan are inadequate to ensure worker <br /> safety and inform the Project Manager of individuals whose on-site <br /> presence jeopardizes their health and safety or the health and safety <br /> of others. <br /> The following Woodward-Clyde personnel will be involved with this <br /> sampling program: <br /> Christopher L. Vais Project Manager <br /> David Parson Staff Engineer <br /> Jay Kamine Staff Engineer <br /> Fred Wehrenberg Staff Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.