Laserfiche WebLink
File No. 20-2949-11 <br /> W-1 K1Ei1EELD,R <br /> December 20, 1990 <br /> Reference is made to Plate I of this report which shows <br /> the location of the proposed parcel split site. Currently, <br /> the majority of the site area consists of almond orchards <br /> with scattered farm houses. Four residences belonging to <br /> Phillips family members are located on the subject <br /> property. <br /> On July 20, 1990, a representative of our firm visited 5 <br /> residences located off Coelho, Union, and Lovelace Roads . <br /> The purpose of our visits was to obtain information on <br /> septic system use and to inquire about any problems known <br /> to exist with this method of sewage disposal . None of the <br /> 5 residences visited reported having problems with the <br /> performance of their septic systems. However, Mr. Fisher <br /> (location 5 on Plate I) indicated they had a faulty tank <br /> replaced. The ages of the septic systems were reported to <br /> be from 2 to 30 years old. No water quality problems were <br /> reported from residences with domestic wells. <br /> ITEM C-2: <br /> "Suitability of soil for development utilizing septic systems. " <br /> On July 23 , 1990, a representative of our firm drilled and <br /> set-up 1 3-foot deep percolation test hole at the proposed <br /> parcel I. The test hole was drilled with hand drilling <br /> equipment using a 6-inch diameter continuous-flight auger. <br /> Perforated PVC pipe was inserted the entire length of the <br /> test hole to prevent disturbance when adding water. The <br /> test hole was filled with relatively clean water and left <br /> to soak overnight. <br /> Copyright 1990 Kleinfelder, Inc. 2 <br />