My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
120
>
2900 - Site Mitigation Program
>
PR0530073
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:41:58 AM
Creation date
12/10/2019 9:36:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0530073
PE
2950
FACILITY_ID
FA0019778
FACILITY_NAME
S J RAPID TRANSIT RTD
STREET_NUMBER
120
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
01
SITE_LOCATION
120 N FILBERT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
water sample at soil/ground water inter-phase to be analyzed for TPH, <br /> BTEX/MTBE and Pb. <br /> • Boring 7: (B-7): Local Laborer's Union #73 : 1 off set soil sample in the <br /> approximate area of the former removed UST next to the building (to be taken 8 <br /> feet: TRE is using this number as an assumed conservative maximum <br /> excavation depth, in the absence of receipt of the maximum excavation depth <br /> data from AECOM, which will used by AECOM in its design documents for this <br /> area) and 1 ground water sample at soil/ground water inter-phase to be analyzed <br /> for TPH, BTEX/MTBE and Pb. <br /> • Boring 8: (B-8): Golden Bay Fence: 1 soil sample in the approximate area of <br /> the former removed UST (to be taken 8 feet: TRE is using this number as an <br /> assumed conservative maximum excavation depth; in the absence of receipt of <br /> the maximum excavation depth data from AECOM, which will used by AECOM in <br /> its design documents for this area) and 1 ground water sample at soil/ground <br /> water inter-phase to be analyzed for TPH, BTEX/MTBE and Pb. <br /> • Boring 9: (B-9): Golden Bay Fence1 soil sample in the approximate area of the <br /> reported area of waste oil impact next to the building (to be taken 8 feet bg: TRE <br /> is using this number as an assumed conservative maximum excavation depth; in <br /> the absence of receipt of the maximum excavation depth data from AECOM, <br /> which will used by AECOM in its design documents for this area) and 1 ground <br /> water sample at soil/ground water inter-phase to be analyzed for TPH Waste oil. <br /> • Boring 10: (B-10): Golden Bay Fence1 off set soil sample in the approximate <br /> area of the reported area of waste oil impact next to the building (8 feet: TRE is <br /> using this number as an assumed conservative maximum excavation depth, in <br /> the absence of receipt of the maximum excavation depth data from AECOM, <br /> Page 12 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.