My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
120
>
2900 - Site Mitigation Program
>
PR0530073
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:41:58 AM
Creation date
12/10/2019 9:36:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0530073
PE
2950
FACILITY_ID
FA0019778
FACILITY_NAME
S J RAPID TRANSIT RTD
STREET_NUMBER
120
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
01
SITE_LOCATION
120 N FILBERT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-SSHSP Responsibility Matrix <br /> Name Title Roles/Responsibilities <br /> 1. Mr. Jay Jahangiri, REM, 12P2 Program • Overall project administration <br /> • Overall authority to stop work per HSO <br /> REM, CESM, REEW, RIAQM, Administrator(PA) recommendation <br /> RMI, CIPS, CUO, • Overall project direction and resources <br /> 2. Mr. Jay Jahangiri, REM, Project Health and • Administers day to day 12P2/SSHSPimplementation/progress <br /> REM, CESM, REEW, RIAQM, Safety Officer(PHSO) Recommends work stoppage to <br /> RMI, CIPS, CUO, PA/FPM <br /> • Provides 12P2/SSHSP training to all <br /> LAS team members and oversee the <br /> subcontractor's health and safety <br /> 3. Mr. Chris Palmer, PG, CEG, Field Project Manager • Overall field drilling and sampling <br /> operations <br /> CHG (FPM) Senior Consulting <br /> Hydrogeologist Day to day interactions with the drilling <br /> and other subcontractors <br /> • Oversees and conducts day to day <br /> sampling operations <br /> 4. Drilling Subcontractor Project Managers • Develop activity health and safetyprocedures (HSP) <br /> 5. Other Subcontractors Project Managers • Ensure consistency of their HSP with <br /> LAS 12P2/SSHSP <br /> • Correct health and safety issues <br /> 13.3 HAZARD ASSESSMENT <br /> This section discusses the identification of general, task, or activity-specific and site- <br /> specific hazards associated with planned field activities for this project. Physical, <br /> chemical, and biological hazards are addressed separately. The job hazard analysis <br /> identifies the potential hazards associated with including but not limited to the following <br /> operations: <br /> • Advancing 10 Geo-probe borings at the foregoing sites <br /> 9 9 9 <br /> • Obtaining soil and ground water samples from each direct push borings <br /> Page 19 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.