Laserfiche WebLink
r <br /> L <br /> MEETING MINUTES -� <br /> JULY 10,1998 DRAFT <br /> DISCO PROPERTY <br /> • Ron indicated his concern that pumping wells located south of the Disco Property may <br /> be influencing flow, even though they are more than 2,000 feet away. He indicated that <br /> flow influences may be exerted at distances of 3 to 5 times the depth of the well. <br /> • Ron recommended that Del Monte destroy the three production wells at Plant 33 if they <br /> are no longer being used to avoid the possibility that they may act as vertical conduits. <br /> Steve Ronzone indicated that the company intended to sell the facility in the next three <br /> years and a new owner may want the wells for use. Ron felt that 3 years was too long to <br /> wait, he will send DelMonte the County ordinance on closing wells. <br /> 3) Liz summarized the cross sectional analysis discussion from the previous meeting. <br /> • It was agreed that some corrections to tables should be made and that the two existing <br /> deep wells would be added to the cross sections. Liz also agreed to update the analysis <br /> to include soil and groundwater data from future studies. <br /> • Ron requested Del Monte to add historic groundwater elevations to cross sections. He <br /> agreed that analytical data could continue to be contained in tables. <br /> 4) The workplan and addendum were discussed: <br /> • Ron suggested that Del Monte conduct the investigation in phases and said that he <br /> would like to see the next phase of investigation focus on the source area in order to <br /> evaluate reactivating the remediation system. He recommended that 5 cone <br /> penetrometer (CPT)logs be obtained, one near NP-1 and the other four located about 30 <br /> to 40 feet away to the north,south,east, and west.Two others to the south on the <br /> shoulder of the freeway may also be useful. In a discussion regarding the need for <br /> approval from CalTrans in order to conduct off-site work, Ron indicated that CalTrans <br /> has promised one-day approval. <br /> • There were concerns expressed regarding the feasibility of using CPTs at this site given <br /> the dense clays that occur here. Liz asked about contingency plans if soils were found to <br /> be too stiff for CPT use. Ron said Gregg Drilling had recently done CPTs in the area and, <br /> and based on its success in that case, are not expected to have a problem at the Disco <br /> property. <br /> • Ron suggested phasing the work such that Phase 1 = CPTs,Phase 2=hydropunch or <br /> other groundwater screening sampling, and Phase 3 = Soil Borings and monitoring <br /> wells. <br /> • Ron indicated the UST Fund (Jim Munch) was approving work similar to what he is <br /> requiring at DISCO,and that we should have no problem having our plan approved. <br /> • Everyone agreed that future quarterly monitoring events will include updated data <br /> tables and groundwater gradient maps to accompany the laboratory data. <br /> • Schedule for Phase I of the investigation: <br /> ➢ CH2M HILL draft to Del Monte by 7/27/98 <br /> ➢ Del Monte review and comment by 8/3/98 <br /> ➢ Final draft from CH2M HILL to Del Monte for transmittal to PHS/EHD <br /> by 8/6/98. <br /> PAGE 2 OF 2 <br />