My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
SITE INFORMATION AND CORRESPONDENCE_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 11:15:59 AM
Creation date
12/10/2019 10:07:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 'VIKQ E'��ENTAL HEALTI1 <br /> ®� Engineers P.17p"IT SERVICE <br /> Planners95 JA) PM 1. 34 <br /> ,1. 3 <br /> Economists <br /> Scientists .. <br /> December 29, 1994 <br /> BAE31604.AS.10 <br /> j <br /> I. Ms.Margaret Lagono . <br /> Environmental Health Division <br /> San Joaquin County, Public Health Services <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> i <br /> Subject: Del Monte/Disco Site, Stockton(Site Code 2498) i <br /> Work Plan Addendum <br /> Dear Margaret: <br /> On behalf of Mi. Soon Kim, Principal Project Engineer with Del Monte Foods, we would like <br /> to respond to the two letters sent by your office on 10/26/94 and 11/17/94, by presenting the <br /> following•Work Plan Addendum to describe proposed remedial investigation work for the <br /> above referenced site. Since receiving your letters, we have been negotiating with drilling <br /> contractors in an attempt to identify the best way to locate up and down-gradient monitoring <br /> wells and perform pump testing. We have also been in the field installing the air sparging/soil <br /> vapor extraction(AS/SVE) system that is considered an interim remediation system designed <br /> to evaluate source removal of gasoline constituents as we have discussed at length in past J <br /> I: „=- meetings:, <br /> a = <br /> We submitted a Remedial Investigation/Feasibility Study report (CH2M HILL, February <br /> 1992)that describes soil gas, soil boring, and groundwater monitoring results in the vicinity of <br /> the former underground storage tanks (USTs) and,gasoline dispensing island. That report <br /> recommends a remediation system that consists of AS/SVE for source removal combined with <br /> pump and treat technology to remove gasoline constituents from down-gradient groundwater. <br /> In the August 19, 1993 quarterly monitoring report, a Conceptual Remediation Plan is <br /> described.for installation and monitoring of the AS/SVE system. AS/SVE system <br /> construction began in August 1994, and it is scheduled for start-up the first week in January <br /> 1995. <br /> i <br /> CH2M HILL 77 11 Broadway,P.O. Box 12687,Oakland,CA 94604-2687 570251-2426 Fax 570 893-8205 <br /> h:\projectsl71604\pm\wpinhlth.doc - w <br />
The URL can be used to link to this page
Your browser does not support the video tag.