Del Monte Stockton Property Assessment and Remediation RFP Section II, Page 4 <br /> of a deeper aquifer will be tested later in December for the first time. The"deep" well <br /> data is expected by the first week in January and will be sent then as Attachment 12. <br /> The Corrective Action Plan requires the best two (2) remediation methods to be <br /> proposed to the SJCPHS and CV WQCB. One method of remediating this site would <br /> be to install a pump and treatment system as part of the solution. This would require <br /> an extraction well and pump test to size the equipment. This work has not been done <br /> to date. The design of such a system and development of any extraction well(s) will <br /> have to be a part of this proposal. If the consultant proposes such a solution, Del <br /> Monte recognizes that the sizing of the equipment and associated costs may depend on <br /> the pumping rate. A pump and treat proposal should be based on the assumption that a <br /> new 6"well could pump at a rate of 25 GPM for budget purposes. The consultant is <br /> free to propose multiple wells of lesser rates based on their best technical judgement <br /> and proposed solution. <br /> The proposal should be based on the assumption that the consultant will be reimbursed <br /> on a time and material basis for work performed. As an alternative,the consultant is <br /> invited to propose other methods of financing this project. These may include a fixed <br /> price solution backed by bonds or insurance, or <br /> also involve transfer of the property to the consultant as part of the reimbursement for <br /> performing the work. These alternative approaches are not a mandatory requirement <br /> for proposing on the work. <br /> The consultant should be aware that Del Monte Foods will be applying for <br /> reimbursement from the California UST Cleanup Fund administered by the State <br /> Water Quality Resources Board, and should be prepared to respond to reasonable <br /> requests to document claims for the fund to support Del Monte submittals. <br /> Proiect Deliverables <br /> • Corrective Action Plan approved by the Agencies in Charge <br /> • Permits for any activities such as air emissions, water discharges, or <br /> solid/hazardous waste <br /> • Completion of any required pilot testing <br /> • Installation of a final solution to remediate the Disco groundwater hydrocarbon <br /> plume and stabilize the migration of the plume including 1,2-DCA and EDB <br /> • Operation and maintenance of the system for 5 years [initially] <br /> • Estimated budget and schedule for the above items including meetings <br /> Desired Schedule <br /> • Begin work on or before February 4, 2002 <br /> • Complete Corrective Action Plan on or before June 1, 2002 <br />