Laserfiche WebLink
\.r N.J <br /> ,� California Regional Water Quality Control BoardE <br /> Central Valley Region ` <br /> a <br /> Robert Schneider,Chair Gray Davis <br /> Winston H.Hickox Governor <br /> Secretaryfor Sacramento Main Office <br /> Environmental Internet Address: http://www.swrcb.ca.gov/rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> draft <br /> Mr. Richard W. Fish <br /> Del Monte Foods <br /> PO Box 9004 DRAFT <br /> Walnut Creek, CA 94598-0904 <br /> REVIEW WORKPLANADDENDUM FOR ADDITIONAL INVESTIGATION <br /> DISCO PROPERTY, 110 FILBERT STREET,STOCKTON,SAN JOAQUIN COUNTY <br /> I reviewed the 16 October 2000 Addendum to the Work plan for Additional investigation at the Disco Property <br /> (Addendum) submitted on behalf of Del Monte Foods by C112M Hill. I am assisting the San Joaquin County <br /> Environmental Health Division(County)by reviewing and commenting on this Addendum; however,the County <br /> will remain the lead oversight agency for future corrective action work at this site. This review was discussed <br /> between Board and County staffs. All drilling and encroachment permits must be secured through the County <br /> and the San Joaquin County Public Works prior to any site work. <br /> In August 2001, CH2M Hill completed nine cone penetrometer test(CPT)borings to define the extent of <br /> groundwater contamination downgradient and cross gradient of the site. Based on this added investigation, <br /> C112M Hill proposes to move three of previously approved intermediate wells (90 to 100 feet)to new locations. <br /> 1. MW-12 is proposed next to CPT-20 in the centerline of the plume. The location for MW-12 is approved. <br /> 2. MW-13 is proposed 240 feet northeast of CPT-21 on Lafayette Street. MW-13 is proposed to define the <br /> eastern edge of the plume at 90 to 100 feet. Depth discrete water samples at 85 and 136 feet in CPT-21 <br /> were non-detect for all constituents, and this location is better suited to monitor the eastern edge of the <br /> plume. Install MW-13 near CPT-21. <br /> 3. MW-14 is proposed next to CPT-24. Contamination in CPT-23 at 144 feet, gw flow direction <br /> consistently to the southeast. Suggest that a cluster of monitoring wells at CPT-17. Based on the CPT <br /> logs for CPT-24, a water-bearing unit was not identified below 106 feet. <br /> In our 2 January 2001 letter, we approved the installation and aquifer testing of a six-inch diameter extraction <br /> well screened across the intermediate sand zone. An aquifer test was planned as part of a feasibility study to <br /> determine if groundwater extraction will effectively capture contamination in the source area. The County <br /> agreed that interim remediation could be postponed while assessment was completed. Now that additional CPT <br /> borings and monitoring wells are being completed and delineation is nearly complete,plume remediation must be <br /> revisited. Please give attention to remediation strategies to reduce the petroleum hydrocarbon,benzene, and <br /> 1,2-dichloroethane contamination in soil and groundwater both on-site and down gradient of the Disco site. <br /> California Environmental Protection Agency FILE C <br /> Q*Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/mgcb5 <br />