Laserfiche WebLink
k4 KLEINFELDER <br /> Monte production wells and numerous city municipal wells in the area the groundwater elevation <br /> has risen approximately 33 feet to its present elevation. <br /> The general direction of groundwater flow in the area of the site, based on the most recent data <br /> issued by the San Joaquin County Flood Control and Water Conservation District, (Spring 1999), <br /> and past reported data from groundwater monitoring events, is to the southeast. The elevation of <br /> first groundwater is approximately-20 feet below mean sea level. According to the same report, <br /> the depth to groundwater in the vicinity of the project site is approximately 45 feet below grade. <br /> l <br /> 12280.GLAC/STO3POI 0 Page 3 of 11 <br /> Copyright 2003,Kleinfelder,Inc. January 15,2003 <br />