My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010839
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0010839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 1:52:47 PM
Creation date
12/10/2019 10:53:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010839
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> 4.4.2 MONITORING AND SAMPLING SCHEDULE DURING OPERATION <br /> During operation, the pilot test system will be monitored frequently on the first day of operation <br /> f. and then visited daily for the purposes of monitoring. Monitoring protocol will serve the <br /> following objectives: <br /> • determine the mass of ozone being injected <br /> • determine location/dynamics of sparging influence <br /> • assess the resiliency and effect of ozone on the nearby groundwater <br /> i <br /> • evaluate radius of influence of the ozone system <br /> 1 • determined the flow/pressure dynamics.of the sparge well <br /> The following table summarizes the monitoring and sampling schedule for the pilot test system. <br /> TABLE 4-3 <br /> MONITORING AND SAMPLING SCHEDULE <br /> F <br /> S stem Coin orient Parameter 1Vlethod Fri`uenc. <br /> S are Well Pressure Fixed Pressure Gauge Hour the first day, then daily <br /> Monitoring Well Total TPH,BTEX, Analytical Sample,EPA First and last day <br /> MW-DIS-1 and 1,2 DCA Method 8260 <br /> Monitoring Wells pH Portable Meter Three times the first day then daily <br /> (MW-DIS-1,AS/SVE-1, DO Portable Meter Three times the first day then daily <br /> AS/SVE-2,NP-1,NP-2, Conductivity Portable Meter Three times the first day then daily <br /> and MW-DIS-9) Temperature Portable Meter Three times the first day then daily <br /> ORP Portable Meter Three times the first day then daily <br /> Dissolved ozone Test Kit Twice the first day then daily <br /> Gaseous ozone Ozone Meter Hourly the first day then daily <br /> 4.5 PILOT SYSTEM MAINTENANCE <br /> All pilot test equipment will be operated and maintained according to manufacturer's <br /> specifications. If problems or anomalies with system operations develop during operation that <br /> cannot be expeditiously resolved by Kleinfelder personnel, a site visit by the manufacturer may <br /> be required for maintenance, troubleshooting and/or repair. At least a 90% system uptime is <br /> anticipated assuming uninterrupted electrical power is provided. In the event system malfunction <br /> } results in downtime exceeding 10% of the proposed operating time, total test duration will be <br /> extended proportionally. <br /> } <br /> 12280/2002R476 Page 20 of 26 <br /> Copyright 2002 Kleinfelder,Inc. May 17,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.