Laserfiche WebLink
APTICLE 7 - SCHEDULING , SUPERINTENDENCE AND SUPERVISION <br /> A. The CONTRACTOR shall furnish , upon receipt <br /> ofthe <br /> executed <br /> eContracttion ofvarious <br /> progress schedule giving dates for the gi9 <br /> items of work. <br /> The CONTRACTOR shall lay out his own Mork , and shall be responsible for <br /> its correctness. <br /> C. The CONTRACTOR shall keep on his Fork dg its all progsess , a c°potent <br /> superintendent and any necessary assistants , <br /> OWNER. The superintendets�Dl�en�nsatisfact be tcryexcept <br /> thewith <br /> COHTRACTDRnandt of <br /> the OWNER , unless he proves <br /> ceases to be in his employ. The superintendent shall represent the <br /> CONTRACTOR in his absence and all directions given to him shall be as <br /> all <br /> binding as if given to the CONTRACTOR. Important direction <br /> be E <br /> confirmed on written request in each case. <br /> ARCHITECT nor the ENGINEER shall <br /> beeponsible for the acts or omissions <br /> of the superintendent orhis assistants. <br /> D. The CONTRACTOR shall give efficient supervision. <br /> oforthe Work , <br /> using his <br /> best skill and attention and shall be responsible <br /> ict <br /> observance of all provisions of the Contract. <br /> dAny <br /> thefailure <br /> CONTRACTORoandsheYe <br /> such provisions shall be considered aefault of <br /> shall be held responsible for any and all direct and indirect consequences <br /> which may arise therefrom. He shall carefully study and compare <br /> drawings , specifications and instructions , and if any errors , <br /> inconsistencies or omissions are discovered shall immediately orally <br /> notify the OWNER thereof ( and promptly thereafter confirm the same in <br /> writing) , and in each such instance he shforegoing <br /> ��ecoj�o betcothe nsideredRor ` <br /> written directions. In no case will the g 9 <br /> received as an excuse for improper or inferior design , workmanship or <br /> materials or as a justification for any claim for extra Work or materials <br /> or for additional compensation. <br /> E. The CONTRACTOR shall at all times enforce strict <br /> idiscandine and <br /> dngood order <br /> song his employees and those of his Subcontractors , <br /> ploy <br /> on the Work any unfit person or anyone not skilled in the Work assigned. <br /> E. The OWNER shall have the right and authority to cause any workman which <br /> the OWNER considers to be incompetent or objectionable to leave t <br /> he <br /> premises at once. <br /> G. The CONTRACTOR shall be fully responsible for <br /> r coordinating and scheduling <br /> the Work of his Subcontractors <br /> H. The Date of Substantial Completion of the Work or a designated <br /> portion <br /> i s the datrtion <br /> e when construction i s sufficientlycomplete <br /> the Drawings and Specifications and a temporary <br /> accordance the <br /> Certificate of Occupancy has been issued so the OWNER can occupy or <br /> for the use far which it is <br /> utilize the Work or designated portion thereof <br /> intended. <br /> l <br /> Issue R 4 <br /> GCL-5- <br />