Laserfiche WebLink
I 31604.DSK <br /> WR-SFO <br /> t SECTION 01300 <br /> SUBMITTALS <br /> PART GENERAL <br /> 1.1 WORK INCLUDES <br /> A. Requirements and procedures necessary for scheduling, preparation, and <br /> submission of submittals. <br /> 1.2 GENERAL <br /> A. The Owner reserves the right to modify procedures and requirements for <br /> submittals, as necessary to accomplish the specific purpose of each <br /> i submittal. Direct inquiries for each submittal shall be directed to the <br /> Engineer <br /> B. Review, acceptance, or approval of substitutions, schedules, shop drawings, <br /> lists of materials, and procedures submitted by the Contractor shall not add <br /> to the Contract amount. Additional costs incurred from submittals shall be <br /> solely the responsibility of the Contractor. <br /> 1, C. The Owner is not precluded, by virtue of review, acceptance, or approval, <br /> from obtaining a credit for construction savings resulting from allowed <br /> concessions in the work. <br /> t <br /> D. The Owner is not responsible to provide engineering or other services to <br /> protect the Contractor from additional costs accruing from the submittals. <br /> E. Submittals processed by the Engineer do not become Contract Documents <br /> and are not Change Orders. The purpose of the submittal review is to <br /> I establish a reporting procedure and to permit the Engineer to monitor the <br /> Contractor's progress and understanding of the design. <br /> 4 F. Delays caused by a need for re-submittal of the submittals shall not be the <br /> basis for a claim. <br /> ` PART 2 PRODUCTS (Not Used) <br /> PART 3 EXECUTION (Not Used) <br /> I END OF SECTION <br /> I . <br /> 1 <br /> BAE31604.AS.T1 <br /> 01300 1 SUBMITTALS <br />