My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:42:45 PM
Creation date
12/10/2019 11:36:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011016
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31604.DSK <br /> WP-SFO <br /> C. Work included consists of the following elements: f <br /> 1. Construction of a concrete pad for support and anchorage of all <br /> process equipment <br /> 2. Construction of a perimeter fence with the following: <br /> a. Tornado fence 6 feet tall with 3 strands of barbed wire at the top <br /> spaced 6 inches apart leaning out. <br /> b. Support posts 8 feet on center with a top rail between each post. <br /> C. Posts mounted in a cast-in-place concrete pedestal <br /> d. Hinged and lockable access gate. <br /> 3. Installation of a security light. E <br /> 4. Connection of the vapor extraction and sparging equipment to the <br /> existing vapor extraction and sparging wells <br /> 5. Functional testing of all mechanical equipment after it is installed. <br /> 6. Start up of the equipment. <br /> 7. Extension of electrical natural gas and telephone service onto the site. <br /> 8. Operation of the system may be included as an optional bid item. <br /> 9. Installation of a post-mounted panel with an electrical distribution box, <br /> motor starters, PLC, and an auto-dialer. <br /> D. The Owner shall install the soil vapor extraction wells, the groundwater <br /> sparging wells, and the piezometers. <br /> PART 2 PRODUCTS (Not Used) <br /> PART 3 EXECUTION (Not Used) <br /> END OF SECTION <br /> 3 <br /> BAE31604.AS.T 1 <br /> 01010 2 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.