Laserfiche WebLink
31604.DSK <br /> WP-SFO <br /> C. Work included consists of the following elements: f <br /> 1. Construction of a concrete pad for support and anchorage of all <br /> process equipment <br /> 2. Construction of a perimeter fence with the following: <br /> a. Tornado fence 6 feet tall with 3 strands of barbed wire at the top <br /> spaced 6 inches apart leaning out. <br /> b. Support posts 8 feet on center with a top rail between each post. <br /> C. Posts mounted in a cast-in-place concrete pedestal <br /> d. Hinged and lockable access gate. <br /> 3. Installation of a security light. E <br /> 4. Connection of the vapor extraction and sparging equipment to the <br /> existing vapor extraction and sparging wells <br /> 5. Functional testing of all mechanical equipment after it is installed. <br /> 6. Start up of the equipment. <br /> 7. Extension of electrical natural gas and telephone service onto the site. <br /> 8. Operation of the system may be included as an optional bid item. <br /> 9. Installation of a post-mounted panel with an electrical distribution box, <br /> motor starters, PLC, and an auto-dialer. <br /> D. The Owner shall install the soil vapor extraction wells, the groundwater <br /> sparging wells, and the piezometers. <br /> PART 2 PRODUCTS (Not Used) <br /> PART 3 EXECUTION (Not Used) <br /> END OF SECTION <br /> 3 <br /> BAE31604.AS.T 1 <br /> 01010 2 SUMMARY OF WORK <br />