My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:42:45 PM
Creation date
12/10/2019 11:36:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011016
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31604.DSK } <br /> WP-SFO <br /> 3. Test 10. While all systems are running, fill the air/water separator <br /> with water to simulate Tests 3 and 4 under field conditions. <br /> Demonstrate system reset after emptying the separator, and of sending <br /> auto dialer message. <br /> 4. Test 11. While all systems are running, turn off the engine system <br /> and demonstrate the automatic stop of the extraction and sparging <br /> systems based on pressure switch, and sending of auto-dialer message. <br /> 5.. Test 12. While all systems are running, manually stop the extraction <br /> blower and demonstrate the automatic stop of the sparging system, <br /> and sending of auto-dialer message. <br /> 3.4 CONTINUOUS OPERATION <br /> A. Continuous operation of the complete system shall not begin until <br /> performance tests are completed to the Engineer's satisfaction. <br /> B. Owner will accept equipment and systems as ready for continuous operation <br /> only after successful testing and startup is completed and documented, test <br /> and startup reports submitted, and manufacturers' services completed for <br /> training of Owner's personnel. <br /> C. Substantial completion of the.operating facility will be met when the facility <br /> has operated a minimum of 7 continuous days. <br /> a <br /> k ' <br /> END OF SECTION 1 <br /> t <br /> f <br /> k <br /> i <br /> BAE31604.AS.T1 <br /> 01650 4 STARTING OF SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.