Laserfiche WebLink
31604.DSK } <br /> WP-SFO f <br /> C. Use curing compound only where approved by Engineer. Cure formed <br /> surfaces with curing compound applied in accordance with manufacturer's <br /> directions as soon as forms are removed and finishing is completed. <br /> 3.7 FIELD TESTS <br /> A. Evaluation of Concrete Field Strength: In accordance with <br /> ACI 318/318R-89. <br /> 3.8 ANCHOR BOLT PLACEMENT <br /> A. Do not begin installation until concrete receiving anchors has obtained <br /> design strength. <br /> B. Do not install an anchor closer than 6 inches from the edge of concrete or <br /> to another anchor. <br /> END OF SECTION <br /> I <br /> i <br /> i <br /> 1 <br /> E <br /> BAE31604.AS.T1 <br /> 03301 5 REINFORCED CONCRETE <br />