My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:42:45 PM
Creation date
12/10/2019 11:36:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011016
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31604.DSK f <br /> WP-SFO <br /> SECTION 13001 <br /> VAPOR EXTRACTION SYSTEM <br /> PART GENERAL <br /> 1.1 WORK INCLUDED <br /> A. This section covers the work necessary to design, furnish, install, and test <br /> one vapor phase extraction system. The system shall include, but not be f <br /> limited to, an extraction blower, a motor, a control panel with a PLC and <br /> auto-dialer, an air/water separator, and associated meters, valves, and <br /> gauges. <br /> B. The system shall be assembled and tested in the plant and brought to the <br /> site as a skid-mounted unit to be placed in the approximate location shown <br /> on the Drawings. <br /> C. The control panel shall be separate from the skid-mounted portion of the <br /> package. <br /> 1.2 GENERAL <br /> A. See Section 01300, SUBMITTALS. I <br /> B. See Section 01650, STARTING OF SYSTEMS. t <br /> C. Include all costs associated with supplying unit to the site, anchoring unit to <br /> the concrete pad, mechanical and electrical connections, functional testing, <br /> and any other work associated with complete installation of the vapor <br /> extraction unit. <br /> 1.3 SUBMITTALS <br /> A. The following information shall be submitted to the Engineer for review <br /> prior to fabrication of the equipment. <br /> 1.. Manufacturer's name and model number for all equipment. <br /> 2. Linear dimensions of the system. <br /> 3. Operating curve for the blower. <br /> 4. Drawings showing the location and description of all temperature, <br /> flow, and pressure monitoring equipment. <br /> 5. Drawings showing the location and description of all valves, filters, <br /> and silencers. <br /> 6. Wiring diagram and description of the control panel, motor starters, <br /> distribution panel, PLC, receptacle outlet, AC/DC converter, <br /> mounting and support system. <br /> 7. Detail showing how the equipment will be anchored to the concrete <br /> pad. <br /> S. Functional description of the auto-dialer with presentation of proposed <br /> messages that will correspond to various warning signals from each of { <br /> the package systems. <br /> BAE31604.AS.T1 <br /> 13001 1 VAPOR EXTRACTION SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.