Laserfiche WebLink
31604.DSK <br /> WP-SFO <br /> C. ALARM indicator light for high-high water in the air/water <br /> separator with shut down of the vapor extraction blower. <br /> d. Automatic shut down of the vapor extraction blower for high r <br /> temperature. <br /> e. A timer with adjustments to run the vapor extraction blower <br /> from 1 to 24 hours each day. <br /> f. A 110-volt receptacle outlet. <br /> 5. The auto-dialer shall have at a minimum of eight monitoring modes <br /> and shall be able to relay the following alert conditions: <br /> a. High water in the air/water separator. <br /> b. High coolant temperature, low oil pressure,'or low supplemental <br /> fuel pressure in engine system. <br /> C. Loss of power to the system. <br /> d. .Low.pressure in sparge blower discharge. <br /> e. Pressure out of operating range (low or high) in vapor extraction <br /> blower discharge. <br /> PART 3 EXECUTION { <br /> 3.1 INSTALLATION <br /> A. The vapor extractions stem shall be installed in accordance ' <br /> P y o dance wath the <br /> System Suppliers written instructions. <br /> B. The Contractor shall be responsible for auto-dialer programming. <br /> 3.2 CERTIFICATION <br /> A. The System Supplier shall provide written certification that the system has <br /> been installed and tested by the Contractor per the supplier's requirements. <br /> 3.3 FIELD TEST <br /> A. After installation, the Contractor shall demonstrate that the system meets <br /> the requirements of the system. Included in the test shall be a <br /> demonstration that the blower can achieve the specified flows and vacuums <br /> and that the alarm conditions, automatic shutdown conditions, and auto- <br /> dialer work as specified. <br /> END OF SECTION <br /> BAE31604.AS.T1 <br /> 13001 5 VAPOR EXTRACTION SYSTEM <br />