My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:42:45 PM
Creation date
12/10/2019 11:36:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011016
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31604.DSK <br /> WP-SFO <br /> C. ALARM indicator light for high-high water in the air/water <br /> separator with shut down of the vapor extraction blower. <br /> d. Automatic shut down of the vapor extraction blower for high r <br /> temperature. <br /> e. A timer with adjustments to run the vapor extraction blower <br /> from 1 to 24 hours each day. <br /> f. A 110-volt receptacle outlet. <br /> 5. The auto-dialer shall have at a minimum of eight monitoring modes <br /> and shall be able to relay the following alert conditions: <br /> a. High water in the air/water separator. <br /> b. High coolant temperature, low oil pressure,'or low supplemental <br /> fuel pressure in engine system. <br /> C. Loss of power to the system. <br /> d. .Low.pressure in sparge blower discharge. <br /> e. Pressure out of operating range (low or high) in vapor extraction <br /> blower discharge. <br /> PART 3 EXECUTION { <br /> 3.1 INSTALLATION <br /> A. The vapor extractions stem shall be installed in accordance ' <br /> P y o dance wath the <br /> System Suppliers written instructions. <br /> B. The Contractor shall be responsible for auto-dialer programming. <br /> 3.2 CERTIFICATION <br /> A. The System Supplier shall provide written certification that the system has <br /> been installed and tested by the Contractor per the supplier's requirements. <br /> 3.3 FIELD TEST <br /> A. After installation, the Contractor shall demonstrate that the system meets <br /> the requirements of the system. Included in the test shall be a <br /> demonstration that the blower can achieve the specified flows and vacuums <br /> and that the alarm conditions, automatic shutdown conditions, and auto- <br /> dialer work as specified. <br /> END OF SECTION <br /> BAE31604.AS.T1 <br /> 13001 5 VAPOR EXTRACTION SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.