Laserfiche WebLink
Mr. Steven Schneider, REHS <br /> ( Page 2 <br /> May 14, 1992 <br /> SFO31604.P3 <br /> monitoring wells (MW-DIS-1 through MW-DIS-7D) and quarterly sampling of MW-DIS- <br /> 3, 4, 6, 7S, 7D. <br /> Laboratory analyses of the groundwater samples will be conducted by a State of <br /> California certified laboratory. Sample analytes of the annual monitoring events (MW- <br /> DIS-1 through MW-DIS-7D) will include total petroleum hydrocarbons (TPH) as <br /> gasoline, benzene, toluene, ethylbenzene, and xylenes (BTEX) (EPA Method 50301602, <br /> 624 or 8260), and lead (Method A.A.) for each sample. Samples analytes of the <br /> quarterly monitoring events (MW-DIS-3, 4, 6, 7S, and 7D) will include TPH as gasoline <br /> and BTEX for each sample. <br /> Design and equipment procurement for the remediation system is expected to occur <br /> during the first six months of 1993 and construction of the remediation system is <br /> expected to occur during the latter six months of 1993. Startup of the soil and <br /> groundwater remediation system is expected to begin in January 1994. <br /> If you have any questions or comments, please contact me or Bern Baumgartner at (510) <br /> 652 - 2426. <br /> Sincerely, <br /> CH2M LL <br /> im y <br /> Project Manager <br /> cc: Mr. Wilbur Sprague/Associated Services <br /> Mr. Ron Thibault/Dei Monte <br /> Mr. Lee Bosche/Del Monte <br /> Mr. Bharat Shah/Dei Monte <br /> Mr. Mark Rosenquist/Del Monte <br /> Mr. David Koll/Del Monte Plant 33 <br />