My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 2:09:03 PM
Creation date
12/10/2019 11:42:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011026
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven Schneider, REHS <br /> ( Page 2 <br /> May 14, 1992 <br /> SFO31604.P3 <br /> monitoring wells (MW-DIS-1 through MW-DIS-7D) and quarterly sampling of MW-DIS- <br /> 3, 4, 6, 7S, 7D. <br /> Laboratory analyses of the groundwater samples will be conducted by a State of <br /> California certified laboratory. Sample analytes of the annual monitoring events (MW- <br /> DIS-1 through MW-DIS-7D) will include total petroleum hydrocarbons (TPH) as <br /> gasoline, benzene, toluene, ethylbenzene, and xylenes (BTEX) (EPA Method 50301602, <br /> 624 or 8260), and lead (Method A.A.) for each sample. Samples analytes of the <br /> quarterly monitoring events (MW-DIS-3, 4, 6, 7S, and 7D) will include TPH as gasoline <br /> and BTEX for each sample. <br /> Design and equipment procurement for the remediation system is expected to occur <br /> during the first six months of 1993 and construction of the remediation system is <br /> expected to occur during the latter six months of 1993. Startup of the soil and <br /> groundwater remediation system is expected to begin in January 1994. <br /> If you have any questions or comments, please contact me or Bern Baumgartner at (510) <br /> 652 - 2426. <br /> Sincerely, <br /> CH2M LL <br /> im y <br /> Project Manager <br /> cc: Mr. Wilbur Sprague/Associated Services <br /> Mr. Ron Thibault/Dei Monte <br /> Mr. Lee Bosche/Del Monte <br /> Mr. Bharat Shah/Dei Monte <br /> Mr. Mark Rosenquist/Del Monte <br /> Mr. David Koll/Del Monte Plant 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.