Laserfiche WebLink
i <br /> DEL-TECH Geotechnical Support Services <br /> t <br /> INTRINSIC MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME:fl�l IVIYVte CQrporai!on AMPLE ANALYSIS"PERFORMED : SEE C.:OF C. <br /> Flbet Road AMP49-VME•,1.4:06 <br /> Stocktarl„CA AMPLE 0NTAINER(S): 2 VOA'S, 3 PLASTIC, 1 <br /> BEIM.:>.: <br /> NALYSha PERFORMED QAL LABS. <br /> CLIENT: CH2M HILL DATE: 04/18/1996 <br /> PROJECT MANAGER: GRANT STEWART AMPLE LOCATION: MW-DIS-4 <br /> AMPLER: DON LIGHT TART TIME: <br /> GROUNDWATER: XXX ADOSE: THER: P.I.D.WELL HEAD READING 0.0 PPM <br /> CASING ELEVATION: FEET MSL ASING DIAMETER:2 INCH <br /> iDEPTH TO WATER: 59.96 FEET ALCULATED CASING VOLUME: 4.84 GAL. <br /> DEPTH OF WELL: 89.62 FEET OTAL VOLUME PURGED: GAL. <br /> TIME YIa[4ME :',PH E► umhs! TEMP: COLOR O.R.P. <br /> gallQln9lntts - Dg ees'C (Visual)1 <br /> dnaw. <br /> ov�rn D.O. pOm. <br /> 13:30 60.16' 7.28 798 20.0 5.5 PPM 1 LT. 90 <br /> TURBID BRN <br /> 13:37 60.14' 7.29 807 21.5 4.7 PPM/" 166 <br /> 13:43 60.13' 7.30 747 22.3 4.4 PPM/" 183 <br /> 13:48 60.13' 7.30 166 22.4 4.41 CLEAR 198 <br /> 13:53 60.14' 7.30 735 23.0 4.8 PPM/" 205 <br /> 13:58 60.13' 7.30 726 22.8 4.6 PPM/" 205 <br /> 14:03 60.13' 7.30 663 22.6 4.5 PPM/" 201 <br /> PURGE METHOD : 2"GRUNDFOS SUBMERSIBLE PUMP. <br /> SAMPLE METHOD: YSI 1 FLOW THROUGH CELL. <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: SEE SITE MAP. <br /> CONTAINMENT: D.O.T. 17 DRUMS <br /> INSTRUMENTATION: ORION pHITEMPERATURE METER 2 POINT pH CALIBRATION (4.0&7.0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />