Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> INTRINSIC MONITORING WELL FIELD LOG <br /> 1996 <br /> ROJECT NAME;Del Monte tpor6bon AMPLE 1 NA L-1-818 PERFORMED : SEE C. OF C. <br /> Irilloet#:Roe� AMpLE:TIME.'15:26 <br /> StdcTcton OA AMPIL,ECONTAINER(S): 2 VOA'S:3 PLASTIC, 1 <br /> 'l1ABER...'.. <br /> [AMPLE <br /> AIS.PERFORMED QAL LASS. <br /> CLIENT: CH2M HILL TE: 04/18/1996 <br /> PROJECT MANAGER: GRANT STEWART LOCATION: MW-DIS-8S <br /> AMPLER: DON LIGHT ART TIME: <br /> GROUNDWATER: XXX ADOSE: OTHER: P.I.D.WELL HEAD READING 0.0 PPM <br /> CASING ELEVATION: FEET MSLCASING DIAMETER:4 INCH <br /> EPTH TO WATER: 59.27 FEET CALCULATED CASING VOLUME: 16.81 GAL. <br /> EPTH OF WELL: 85.02 FEET OTAL VOLUME PURGED: GAL. <br /> TIME; VQLUM .. RH.. .. ... EC; u[nhosfo TEMP: COLOR. O.R.P. <br /> I t1 aures C {visual)-/ <br /> . ... . .. .:,.. . ..... .:.: ... <br /> draw ........ D.O.ppm. <br /> 14:40 59.46' 7.49 720 22.4 0.6 PPM/ 123 <br /> CLEAR <br /> 14:46 59.62' 7.43 900 22.5 0.4 PPM/" 90 <br /> 14:52 59.56' 7.44 831 22.7 0.4 PPM 1" 42 <br /> 14:57 59.56' 7.44 860 22.8 0.4 PPM 1" 35 <br /> 15:02 59.58' 7.43 887 22.7 0.3 PPM 1" 30 <br /> 15:08 59.58' 7.43 870 22.6 0.2 PPM 1" 24 <br /> PURGE METHOD : 2"GRUNDFOS SUBMERSIBLE PUMP. <br /> SAMPLE METHOD: YSI 1 FLOW THROUGH CELL. <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE,LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: SEE SITE MAP. <br /> CONTAINMENT: D.O.T. 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 &7.0) <br /> ORION CONDUCTIVITY METER <br /> t ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />