My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002375
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WARD ISLAND
>
0
>
2600 - Land Use Program
>
UP-91-20
>
SU0002375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 7:34:34 PM
Creation date
12/10/2019 1:45:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002375
PE
2626
FACILITY_NAME
UP-91-20
STREET_NUMBER
0
STREET_NAME
WARD ISLAND
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
WARD ISLAND
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V -� 1lL <br /> h <br /> SAN JOAOUIN COUNTY V ��y 2 �: 199► <br /> DEPARTMENT OF PLANNING AND BUILDING INSPECTION I TW <br /> r. : <br /> 1810 E. HAZELTON AVE , STOCKTON, CA 95205 P-`= CHET DAVISSON <br /> c��1Fop`i:• PLANNING PHONE. 209/468-3120 Director <br /> BUILDING PHONE 209/4683123 JERRY HERZICK <br /> NEIGHBORHOOD PRESERVATION PHONE 209/468-3021 June 21, 1991 <br /> Oepwy Director <br /> RENEJACKSON <br /> Deputy Director <br /> TOM WALKER <br /> TO: Development Committee DeputyDkector <br /> FROM: Richard Larrouy, Associate Planner," <br /> SUBJECT: USE PERMIT PRE-APPLICATION NO. UP-91-20 OF THE STOCKTON <br /> WATER SKI CLUB (C/O DCC ENGINEERING CO. , INC. ) <br /> The applicant has submitted a Use Permit pre-application to allow <br /> the dredging of a channel and basin in an island in the Delta to <br /> create a protected harbor for a private, non-profit ski club; the <br /> relocation of an existing boat dock, swim dock, and clubhouse; and <br /> the construction of a beach and open camping area. Future <br /> development would consist of an expansion of the boat docking <br /> facilities and clubhouse, as well as the construction of a <br /> caretaker's residence. The project would be phased, possibly over <br /> a ten-year period, with the dredging of the channel and basin as <br /> the first phase. The following pre-application comments are <br /> intended to inform the applicant of preliminary considerations on <br /> General Plan and zoning consistency, permitting requirements, and <br /> environmental considerations. <br /> General Plan / Zoning Considerations: <br /> The General Plan designation for the project site is Agriculture, <br /> with an accompanying zoning of AG-40 (General Agriculture; 40 acre <br /> minimum parcel size) . The proposal, which involves an expansion of <br /> an existing use, appears to be consistent with both Agriculture and <br /> Recreation General Plan Principles and Objectives. Section 9- <br /> 4005. 1 (c) (12) of the Planning Title allows the proposed use, <br /> subject to an approved Use Permit application. <br /> Permitting Requirements: <br /> As indicated by the attached memos, permits will be required from <br /> the Department of the Army' s Corps of Engineers and the Port of <br /> Stockton. Unless otherwise noted by the responsible agencies, <br /> these Permits would likely be required as conditions of approval on <br /> an approved application, rather than being required prior to <br /> submittal of the full application. Again unless otherwise stated, <br /> any conditions of approval from the responsible agencies would have <br /> to be complied with prior to the initiation of the use. NOTE: <br /> Additional permitting requirements may be identified as a result of <br /> a referral of the full application to appropriate, responsible <br /> agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.