My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002948
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
2600 - Land Use Program
>
SA-96-71
>
SU0002948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 3:21:10 PM
Creation date
12/10/2019 2:49:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002948
PE
2633
FACILITY_NAME
SA-96-71
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
6484 N WAVERLY RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> manageement districts. The San Joaquin Valley Unified Air Pollution <br /> District recently made a finding to verify this . The engine has an <br /> approximate destruction efficiency of 98% . <br /> The facility will be on a plot approximately 200 ft. X 200 ft. , <br /> surrounded by an eight-foot high chain link fence . On the site <br /> will be a building to house the engine-generator, controls and <br /> switch gear. The main landfill gas header enters the facility and <br /> goes through a knock-out drum that removes particles and moisture. <br /> The moisture, gas condensate, is nonhazardous . Gas then goes <br /> through the blower, a cooler and to the engine. The engine has a <br /> closed circuit fluid cooling system. Radiators and coolers are <br /> outdoors . Electrical switch gear, breakers, synchronizing panels <br /> and the motor control center are in the building. Transformers and <br /> the interconnection are outside and may be off-site. <br /> Gas is not stored on site or held at elevated pressures . The <br /> facility presents no unusual fire or safety hazard. The expected <br /> sound level will be about 70 dba at a distance of 100 feet from the <br /> building. After construction, the project will generate virtually <br /> no traffic. The unmanned facility will have periodic inspections <br /> and maintenance . A control system notifies the operator of <br /> shutdowns and alarms . Response time should be within four hours <br /> during regular business hours . <br /> jrk:10-28-96 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.