Laserfiche WebLink
4} <br /> City of Stockton <br /> Page 2 <br /> r <br /> 1.740 Houston <br /> Monitoring well (1v1" 3 has that had been located has been sampled and <br /> it appears the well is still viable. Two additional-Imonitoring wells have <br /> been installed. Newly installed monitoring well 4 had 660 parts per billion <br /> of MTBE in the water sample collected from it: Further investigation has. <br /> been proposed`by the consultant. PHSIEHD will review the recently <br /> t. <br /> spbmitted report from the consultant and all sites information and commen. <br /> an the proposed further work.. <br /> j 6803 Alexandriia. ?' � <br /> PHSIEHDhas issued a"no further action required"letter for this site.. <br /> I � <br /> .4 <br /> Monitoring well 1 is the q-nly well evidencing contamination. The.water is ` <br /> E <br /> 10 feet above the screen'int a"l in this well. Water samples from ail the l <br /> wells will be collected and analyzed in december 1`999, If the result$ of r <br /> those water samples are the.;same as or lower than the previous water <br /> samples, PHSIEHD will.request concurrence from the Central Malley <br /> Regional.Water Quality:Control Board {CVRWtCB)for"no further action <br /> required"at this site, y <br /> j 1701 Washington } <br /> The underground storage tank (UST) piping has beers closed in place:and <br /> the soil sample collected beneath the dispenser was rion detect for <br /> contaminants. A request for concurrence from the CVR111lQCB for" no <br /> further action.required"at this site has been prepared. <br /> R all Oaks at Princess <br /> j Investigation of the site has been performed. MTBE was not requested in <br /> 1 the analysis of the samples submitted to the laboratory. The laboratory <br /> a has read the chromatogram of the samples analyzed and provided a <br /> revised analysis that includes MTBE. Since the muting PHS/EHD`has <br /> received concurrence from the CVRWQCB for`;no further action required" <br /> at this site. Once destruction of the sail baring that pierced a storm drain <br /> (that now requires repair) is completed,the "no further action required" <br /> l; letter will be prepared. <br /> T <br /> i - <br />