My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
5023
>
2900 - Site Mitigation Program
>
PR0505777
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 8:58:58 AM
Creation date
12/11/2019 8:45:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505777
PE
2950
FACILITY_ID
FA0006180
FACILITY_NAME
RAMACHER MANUFACTURING CO
STREET_NUMBER
5023
STREET_NAME
FLOOD
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
10517032
CURRENT_STATUS
02
SITE_LOCATION
5023 FLOOD RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br /> (IF <br /> 1. Mapping and locations of structures are based on facility <br /> -- record drawings. Contractor shall coordinate all field <br /> activities with Hydro—Search personnel. <br /> " 2. Identified areas to be excavated and excavation depths are <br /> FwEi ISIA','D Ir-E'l, U I <br /> approximate. Final locations will be delineated by Hydro—Search <br /> f It in the field. <br /> Area No. I <br /> LRemove soils from <br /> 5 3. The contractor shall be responsible for confirming the location of <br /> 5'x20' area to 2' bgs. I <br /> - ----- .. ............. !x t( 4) ..L. all utilities and interferences. Exact locations of existing utilities and <br /> �(Wofe L <br /> 6 i:�. <br /> structures are not guaranteed. All existing utilities and improvements <br /> Area No. I D damaged during construction shall be completely restored by the <br /> R �v.ene sels from III contractor, at the contractor's own expense, and to the satisfaction <br /> m <br /> 414 to 2' bgs.�" of the utility owner. The contractor shall request that underground Ir <br /> AP_A L <br /> facilities be located and marked in the field a minimum of 48 <br /> ....... �M PF E hours prior to the start of construction by calling underground <br /> f services alert (U.S.A.), telephone No. (800) 642-2444. <br /> Area No. <br /> —Area No. 4 <br /> IN <br /> area to 2' bgs. Remove soils from 4. Remove soils on either side of an east—west utility trench <br /> Remove soils from 6'x7' I in Area <br /> TFA,-J'.FrER Coordinate with hydro—Seexcavated <br /> rch prtares <br /> field <br /> j- 15'05' area to 3' bgs. <br /> IS activities. Place steel cover over excavated area for interim period <br /> (Note-S)—-- <br /> �[C( �C'12ER LNE <br /> I prior to backfill. Cover shall provide sufficient strength for H-20 <br /> r: IAP I rating. Restore asphalt surface to original condition. <br /> 'j, 5. Restore asphalt surface at Area No. 4 to original condition. <br /> tli <br /> W. <br /> AREA <br /> ................... <br /> LEGEND <br /> i <br /> v, DRAINAGE DIRECTION <br /> FENCE <br /> "A 0 f, FENCE ON PROPERTY LINE <br /> Pru, <br /> TRANSFORMER <br /> AREAS TO BE EXCAVATED <br /> I P SIHOP <br /> bgs <br /> BELOW GROUND SURFACE <br /> ASDIVOT Y 1 , <br /> ti <br /> -------- FMC Corporation DATE: 11/2/95 <br /> Stockton, California DESIONED. JJL <br /> EXCAVATION PLAN CHECKED: <br /> APPROVED: <br /> DRAWN: BOB <br /> FR Manufacturing Site PROJ.: 501135042 <br /> A Tetra Tech Contpuy <br />
The URL can be used to link to this page
Your browser does not support the video tag.