Laserfiche WebLink
r 04/05/2000 14:43 209-579-222_x' MODESTO ATC PAGE 09 f <br /> F <br /> COS <br /> Paee;. <br /> Fontana Drive/Smith's Canal <br /> ' Monitoring well, MW4, is very slow to recharge. Free product continues to be removed. <br /> ' All the perimeter wells are non-detect at laboratory detection limits. The COS will request in <br /> September/October 1992, to have the sampling frequency of perimeter wells reduced. <br /> " <br /> RESNA will evaluate the construction of perimeter wells and dbcm the feasibility of <br /> hydropunching test holes or excavating shallow pits to define the plume of diesel contamination. <br /> Onix the plume is identified, remedial options will be investigated. The problem of pea gravel fill <br /> in relation to remedial options was discussed. <br /> ' The irrigation well will be destroyed by December 1992. <br /> 1501 Picardy <br /> ' The summary report of the results of the re-excavation attempt will be submitted by October 1992 <br /> 110 West Sonora <br /> ° The due date for the final remedial plan/feastbility study was extended to January 1993. <br /> The next meeting was scheduled December 7, 1992 to be held at the PHS/EHD office. <br /> Should you disagree with the summary of the August 17, 1992 meeting, please contact <br /> Mary Mesys at (209)468-0337 or Linda Turkatte at (209) 468-0339 of my stat <br /> Jogi Khanna, M.D., <br /> Health Omce <br /> urie A Cotulia, RENS, Program Manager <br /> nvironmental Health Division <br /> LAC/MM:lb <br /> c Elizabeth Thayer, CVRWQCB <br /> Jim Escobar, COS Public Works <br /> c: Stephen Chen, COS Public Works <br /> c Sara Cortes, COS Public Works <br /> c Glen Birdzell, COS Municipal Utilities <br /> Mark Madison, COS Municipal Utilities <br /> ✓c: John Lane. RESNA Esnlon <br /> C, Eloise Cherven, RESNA Sacramento <br /> r <br />