My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 10:49:24 AM
Creation date
12/11/2019 9:32:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC� IEALTH SER ICES <br /> SAN JOAQUIN COUNTY , <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer o°i;F'o"a`'P'• t <br /> 445 N. San Joaquin Street • P.O. Box 388 • Stockton, CA 95201-0388 <br /> (209) 468-3420 <br /> JAMES GIOTTONINI Capy <br /> PUBLIC WORKS DIRECTOR <br /> CITY OF STOCKTON . <br /> 425 N EL DORADO STREET <br /> STOCKTON CA 95202 'JUN10 1994, <br /> RE: FONTANA DRIVE AT SMITH CANAL SITE CODE: 1102 <br /> STOCKTON CA <br /> San Joaquin County Public Health Services, Environmental Health <br /> Division, pursuant to the California Code of Regulations, Chapter <br /> 16, Article 11, Section 2728, has initiated the public <br /> participation process for the above mentioned site. <br /> A copy of the "Notice of Findings" is enclosed for your <br /> information and files. The public participation period ended <br /> thirty days from the date noted on the "Notice of Findings". <br /> The Interim Corrective Action Plan appears to sufficiently <br /> address the soil and groundwater contamination plume that has <br /> been identified at the site. As no comments have been received <br /> by the public during the public participation period, the <br /> proposed work can be scheduled to begin at any time. <br /> If you have any questions or concerns, please contact me at (209) <br /> 468-3441. <br /> Donna Heran, REHS, Director 11 <br /> Environmental Health Division <br /> ` f <br /> Li da Turkat Senior Dian iJInson, REHS <br /> Site Mitigation Unit Supervisor <br /> LT <br /> Enc. <br /> c: Beth Thayer, CVRWQCB c: Jim Escobar, COS Public Works <br /> c: Stephen Chen, COS Public Works c: Sara Cortes, COS Public Works <br /> c: John Lane, RESNA <br /> A Division of San Joaquin County Health Care Services 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.