My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 10:49:24 AM
Creation date
12/11/2019 9:32:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 4, 1992 <br /> Henning Bros Drilling Co. , Inc. <br /> Page -2- <br /> Smith Canal Sanitary Pump Station Well <br /> The cementing material for the cement grout shall conform to <br /> API Class A cement. The mixture shall be a slurry of cement- <br /> sand grout and be composed of no less than ten (10) 94 lb <br /> sacks of cement per yard with a water to cement ratio of no <br /> more than 5 gal/sack. The cement mixture density shall be no <br /> less than 112 lb/cubic ft. Bentonite, to make the mix more <br /> fluid and reduce shrinkage, may be used to a total of four (4) <br /> percent of the volume of cement. Water used in the cement <br /> shall be clean, potable water. <br /> 4 . Remove the reinforced concrete slab, excavate down, and cut <br /> and remove the well casing 5 feet below ground surface. Pour <br /> additional cement grout into the well so that it completely <br /> fills and overtops the remaining well casing, creating a grout <br /> cap on the casing. <br /> S. Backfill the excavation with native material, compact, and <br /> grade to match that of the surrounding area. <br /> 6. Clean the work area to its condition prior to the start of <br /> work. Dispose of all removed concrete and casing off-site. <br /> It will be the responsibility of the Contractor to perform the work <br /> in a manner as clean as possible. Any water and/or cement spilled <br /> around the well head shall be completely contained and disposed of <br /> in a proper manner. <br /> Please note that, for this project, insurance verification will be <br /> required as is standard for all City projects. Our standard <br /> insurance forms are attached and must be completed and included <br /> with your proposal. Information on our insurance requirements can <br /> be obtained from our Risk Management Department at (209) 944-8508. <br /> Please respond to this request by November 13, 1992. To arrange a <br /> site visit, or if you have any questions, please contact me at <br /> (209) 944-8782 . <br /> MORRIS L. ALLEN <br /> MUNICIPAL UTILITIES DIRECTOR <br /> MARK J. MADISON <br /> ASSOCIATE ENGINEER <br /> MJM:mjm <br />
The URL can be used to link to this page
Your browser does not support the video tag.