Laserfiche WebLink
RESNA <br /> SITE SAFETY PLAN <br /> is <br /> Job Name: Stockton/Smith Canal <br /> Job Location: Fontana Avenue, Stockton CA <br /> Client Name: City of Stockton <br /> -j <br /> 1 Project Number: W0365.02 Date: March 7, 1994 <br /> General Work Description: Excavation/Soil & Groundwater Sampling <br /> SSP Prepared by: Marcie McCabe <br /> G: On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: John P. Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by <br /> all on-site employees, subcontractors, and visitors prior to entering the site. General safe <br /> work practices are identified in the RESNA Injury and Illness Prevention Manual and apply <br /> to all RESNA work sites. <br /> -1 The provisions set-forth in this SSP shall apply to RESNA Industries Inc. (RESNA) <br /> employees and any subcontractors working for RESNA at the job site. All personnel <br /> working for RESNA at the job site must read this SSP, and sign the attached Compliance <br /> Agreement before entering the work area. Field personnel may deviate from the safety <br /> provisions set-forth in this SSP, but only to upgrade or increase the safety requirements. <br /> RESNA personnel may suspend work if unsafe working conditions are identified or <br /> `. observed, or unauthorized modifications to the safety provisions set-forth in this SSP are <br /> made. If changes in site or working conditions require changes in safety procedures, <br /> "i appropriate amendments to this SSP will be provided by the RESNA project manager or <br /> J supervisor, with the written approval of a RESNA branch safety officer or the RESNA <br /> Health and Safety Director. <br /> �1 <br />