Laserfiche WebLink
P� <br /> l►.ESNA <br /> SITE SAFETY PLAN <br /> i <br /> f=_a <br /> kk Job Name: Stockton/Smith Canal <br /> lI� <br /> Job Location: Fontana Avenue, Stockton CA <br /> Client Name: City of Stockton <br /> Rl Project Number: W0365.01 Date: January 4, 1993 <br /> General Work Description: Drilling/Soil & Groundwater Sampling <br /> j <br /> SSP Prepared by: Tom Lutterman <br /> r_' On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: John P. Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by <br /> all on-site employees, subcontractors, and visitors prior to entering the site. General safe <br /> work practices are identified in the RESNA Injury and Illness Prevention Manual and apply <br /> to all RESNA work sites. <br /> r <br /> The provisions set-forth in this SSP shall apply to RESNA Industries Inc. (RESNA) <br /> employees and any subcontractors working for RESNA at the job site. All personnel <br /> �_' working for RESNA at the job site must read this SSP, and sign the attached Compliance <br /> " <br /> Agreement before entering the work area. Field <br /> gree g personnel may deviate from the safety <br /> provisions set-forth in this SSP, but only to upgrade or increase the safety requirements. <br /> E RESNA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are <br /> �- made. If changes in site or working conditions require changes in safety procedures, <br /> appropriate amendments to this SSP will be provided by the RESNA project manager or <br /> supervisor, with the written approval of a RESNA branch safety officer or the RESNA <br /> = � Health and Safety Director. <br /> a <br /> s <br />